Project intelligenceTDLR TABS2024014086New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Pflugerville ISD - CTE Center

Andrewartha Tract, Wells Branch Parkway, Pflugerville, TX, 78660

Opening ~Apr 2027Review Complete

Pflugerville ISD - CTE Center is a new construction project at Andrewartha Tract, Wells Branch Parkway, Pflugerville, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Apr 2027. The project has an estimated value of $62.0M across about 111,000 sq ft.

Estimated project value
$62.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
111,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$559/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 5mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 18, 20241,124 days across supplied datesApr 16, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    616 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    508 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Pflugerville ISD - CTE Center

Pflugerville ISD is constructing a new Career and Technical Education (CTE) Center in Pflugerville, Texas. The project, filed with the Texas Department of Licensing and Regulatory Affairs (TDLR) as Pflugerville ISD - CTE Center, is a new construction facility designed to serve grades 9 through 12. The building will cover 111,000 sq ft and is located on the Andrewartha Tract along Wells Branch Parkway.

The estimated cost for this development is $62,000,000, which calculates to $559 per square foot. This figure is above the county median of $125 per square foot for new construction projects in Travis County. The project involves public funds and public land, with Pflugerville ISD listed as the owner and developer of record.

Timeline and Status

TDLR completed plan review in March 2024, and the project is scheduled to finish in April 2027. Construction start is recorded for November 2025. The scheduled build window is 508 days, which is longer than the county median of 304 days for similar new construction filings. Kathy Ann Riley is the registered accessibility specialist for this project.

Pflugerville ISD has six other TDLR-registered projects totaling $20,493,392. These include the C&T Building, which is closed, and the Pflugerville ISD Administration Building, which is review complete. The district’s recent filings indicate a consistent pattern of infrastructure investment in the area.

Local Context and Activity

Third-party sources indicate active site work. A Facebook post by BartlettCockeGC described joining Pflugerville ISD to break ground on the center. An Instagram post noted that earthwork is officially underway at the site. These updates align with the TDLR record, which shows the project moving from review to the construction phase.

The project is situated in ZIP code 78660, where the U.S. Census ACS 2023 five-year estimates indicate a population of about 118,437. The median household income in this area is $109,522, and the median owner-occupied home value is $369,300. The Travis County unemployment rate was 4 percent in June 2026, higher than a year earlier.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78660 (Pflugerville)

One email per change. Unsubscribe in one click. Privacy.

Pflugerville ISD - CTE Center is a New Construction project located at Andrewartha Tract, Wells Branch Parkway, Pflugerville, TX 78660 in Pflugerville, Texas. The project has an estimated value of $62.0M covering 111,000 sq ft. Pflugerville ISD is the property owner. The project was registered with TDLR on March 18, 2024.

Frequently Asked Questions

When is the CTE Center scheduled to finish?

The project is scheduled to finish in April 2027. TDLR completed plan review in March 2024, and construction is set to start in November 2025.

What is the estimated cost of the project?

The estimated cost is $62,000,000. This equates to $559 per square foot for the 111,000 sq ft facility.

Who is the owner of the CTE Center?

Pflugerville ISD is the owner and developer of record. The project is a new Career and Technical Education Center for grades 9 through 12.

Is the CTE Center open now?

No, the project is in the construction phase. TDLR records show it is scheduled to finish in April 2027, with work starting in November 2025.

Where is the new CTE Center located?

It is located on the Andrewartha Tract along Wells Branch Parkway in Pflugerville, Texas 78660.

What is Pflugerville ISD - CTE Center?

Pflugerville ISD - CTE Center is a new construction project at Andrewartha Tract, Wells Branch Parkway in Pflugerville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: A NEW CAREER AND TECHNICAL CENTER FOR GRADES 9 THROUGH 12 FOR PFLUGERVILLE ISD.

Is Pflugerville ISD - CTE Center open in Pflugerville?

Pflugerville ISD - CTE Center is still under construction in Pflugerville, TX, with an estimated completion of Apr 2027 according to its TDLR registration.

Where is Pflugerville ISD - CTE Center located?

Pflugerville ISD - CTE Center is located at Andrewartha Tract, Wells Branch Parkway, Pflugerville, TX, 78660, in Travis County.

Who is the owner or developer of Pflugerville ISD - CTE Center?

Pflugerville ISD is the property owner/developer of record for Pflugerville ISD - CTE Center, per its TDLR project registration.

How much does Pflugerville ISD - CTE Center cost and how big is it?

Pflugerville ISD - CTE Center has an estimated construction value of $62.0M and approximately 111,000 square feet (about $559/sqft), based on its TDLR filing.

Scope of Work

A NEW CAREER AND TECHNICAL CENTER FOR GRADES 9 THROUGH 12 FOR PFLUGERVILLE ISD.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Andrewartha Tract, Wells Branch Parkway, Pflugerville, TX, 78660

Location by street address

Watch all construction in 78660 (Pflugerville)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Pflugerville?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.