Project intelligenceTDLR TABS2026017412Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Administration Building Reconfiguration - Phase 1

1401 W Pecan St, Pflugerville, TX, 78660

Opening ~Jun 2027Review Complete

Administration Building Reconfiguration - Phase 1 is a renovation/alteration project at 1401 W Pecan St, Pflugerville, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jun 2027. The project has an estimated value of $2.0M across about 6,000 sq ft.

Estimated project value
$2.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
6,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$333/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 13, 2026414 days across supplied datesJun 1, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    14 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    35 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    365 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Administration Building Reconfiguration - Phase 1

Pflugerville ISD Administration Building renovation work is underway at 1401 W Pecan St, Pflugerville, TX 78660. The project, filed as Administration Building Reconfiguration - Phase 1, involves the interior demolition and renovation of first and second floor spaces within the existing structure. The work covers 6,000 sq ft of space with an estimated cost of $2,000,000.

Construction is scheduled to finish in June 2027, with work starting in June 2026. TDLR completed plan review in April 2026, and the registration status is Review Complete. The registered accessibility specialist for this project is Kathy Ann Riley, and the design firm of record is PBK Architects.

Project Scale and Funding

The estimated cost of $2,000,000 translates to $333 per square foot. This figure is above the Travis County median of $103 per square foot for similar renovation and alteration filings. The total estimated cost is also above the county median of $298,000, placing the project in the top quarter of costs for its type in the region. The scheduled build window is 365 days, which is longer than the county median of 98 days for comparable projects.

This project involves public funds and public land. Pflugerville ISD has six other TDLR-registered projects totaling $80,493,392, including the CTE Center and Dessau Middle School. PBK Architects, the design firm, has six other TDLR-registered projects totaling $114,757,737, including the Southside Launchpad CIC and Royal STEM Academy.

The surrounding area, ZIP code 78660, has a population of about 118,437 according to U.S. Census ACS 2023 five-year estimates. The median household income is $109,522, and the median owner-occupied home value is $369,300. Housing in this area is mostly owner-occupied, with 44,399 housing units recorded.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78660 (Pflugerville)

One email per change. Unsubscribe in one click. Privacy.

Administration Building Reconfiguration - Phase 1 is a Renovation/Alteration project located at 1401 W Pecan St, Pflugerville, TX 78660 in Pflugerville, Texas. The project has an estimated value of $2.0M covering 6,000 sq ft. Pflugerville ISD is the property owner and PBK Architects is the design firm of record. The project was registered with TDLR on April 13, 2026.

Frequently Asked Questions

What is the scope of the work?

The scope consists of interior demolition and renovation of first floor and second floor spaces of the existing Pflugerville ISD Administration Building. The work covers 6,000 sq ft.

When is construction scheduled to finish?

Construction is scheduled to finish in June 2027. Work is scheduled to start in June 2026, following plan review completion in April 2026.

Who is the design firm?

The design firm of record is PBK Architects. The registered accessibility specialist is Kathy Ann Riley.

Is the project using public funds?

Yes, the project involves public funds and public land. It is a Federally funded roadway project or involves public funds, as noted in the filing.

How does the cost compare to other projects?

The $2,000,000 estimated cost is above the Travis County median of $298,000 for renovation and alteration filings. The $333 per sq ft cost is above the county median of $103.

What is Administration Building Reconfiguration - Phase 1?

Administration Building Reconfiguration - Phase 1 is a renovation/alteration project at 1401 W Pecan St in Pflugerville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: THE WORK OF THE PROJECT, AS DEFINED BY THE CONTRACT DOCUMENTS, CONSISTS OF THE INTERIOR DEMOLITION AND RENOVATION OF FIRST FLOOR AND SECOND FLOOR SPACES OF AN EXISTING PfUGERVILLE ISD ADMINISTRATION BUILDING. THE SCOPE INCLUDES A RENOVAT…

Is Administration Building Reconfiguration - Phase 1 open in Pflugerville?

Administration Building Reconfiguration - Phase 1 is still under construction in Pflugerville, TX, with an estimated completion of Jun 2027 according to its TDLR registration.

Where is Administration Building Reconfiguration - Phase 1 located?

Administration Building Reconfiguration - Phase 1 is located at 1401 W Pecan St, Pflugerville, TX, 78660, in Travis County.

Who is the owner or developer of Administration Building Reconfiguration - Phase 1?

Pflugerville ISD is the property owner/developer of record for Administration Building Reconfiguration - Phase 1, per its TDLR project registration.

Who is the architect or design firm for Administration Building Reconfiguration - Phase 1?

PBK Architects is the design firm of record for Administration Building Reconfiguration - Phase 1, according to its TDLR filing.

How much does Administration Building Reconfiguration - Phase 1 cost and how big is it?

Administration Building Reconfiguration - Phase 1 has an estimated construction value of $2.0M and approximately 6,000 square feet (about $333/sqft), based on its TDLR filing.

Scope of Work

THE WORK OF THE PROJECT, AS DEFINED BY THE CONTRACT DOCUMENTS, CONSISTS OF THE INTERIOR DEMOLITION AND RENOVATION OF FIRST FLOOR AND SECOND FLOOR SPACES OF AN EXISTING PfUGERVILLE ISD ADMINISTRATION BUILDING. THE SCOPE INCLUDES A RENOVATION OF A SET

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1401 W Pecan St, Pflugerville, TX, 78660

Location by street address

Related City Permits

Building permits found at or near this location

1401 ART DILLY DR UNIT 331

Replacement of complete existing central heat and air system with or without duct work

ActiveMechanical PermitChange OutSep 2026
View Details
2026-118130 MP
Texas Multifamily Solution, LLC
1401 SWEET BARK ST

Install Level 2 EV Charger

FinalElectrical PermitSpecial Inspections ProgramSep 2026
View Details
2026-116807 EP
Charge Pro LLC
14016 BOQUILLAS CANYON DR

Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 ton gas vertical

ActiveMechanical PermitChange OutAug 2026
View Details
2026-111015 MP
Stan's Heating, Air, Plumbing, & Electrical
1401 PHILOMENA ST UNIT 420

7 DAY - 2 applications. Suite 415 and 420. 420:INTERIOR ALTERATION OF APPROX. (2310SF) OF EXISTING INTERIOR OFFICE SPACE. 415:INTERIOR ALTERATION OF APPROX. (2660SF) OF EXISTING INTERIOR OFFICE SPACE. - OVA

ActiveElectrical PermitRemodelAug 2026
View Details
2026-089991 EP
Duvall Electric
1401 PHILOMENA ST UNIT 415

7 DAY - 2 applications. Suite 415 and 420. 420:INTERIOR ALTERATION OF APPROX. (2310SF) OF EXISTING INTERIOR OFFICE SPACE. 415:INTERIOR ALTERATION OF APPROX. (2660SF) OF EXISTING INTERIOR OFFICE SPACE. - OVA

ActiveElectrical PermitRemodelAug 2026
View Details
2026-089992 EP
Duvall Electric

Watch all construction in 78660 (Pflugerville)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Pflugerville?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.