Mark IV Summit II Management Office T.I. is a renovation/alteration project at 710 Hester's Crossing Suite 180, Round Rock, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2020). The project has an estimated value of $100K across about 1,151 sq ft.
Project has been completed and closed
Mark IV Summit II Management Office T.I. is a Renovation/Alteration project located at 710 Hester's Crossing Suite 180, Round Rock, TX 78664 in Round Rock, Texas. The project has an estimated value of $100K covering 1,151 sq ft. Mark IV La Frontera, LLC is the property owner and Spencer-Pierce Architecture + Interiors is the design firm of record. The project was registered with TDLR on June 30, 2020.
Mark IV Summit II Management Office T.I. is a renovation/alteration project at 710 Hester's Crossing Suite 180 in Round Rock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Add break area, new offices and conference room.
Construction on Mark IV Summit II Management Office T.I. is complete โ TDLR records show the project passed its required accessibility inspection in Nov 2020. The building is finished and very likely open.
Mark IV Summit II Management Office T.I. is located at 710 Hester's Crossing Suite 180, Round Rock, TX, 78664, in Williamson County.
Mark IV La Frontera, LLC is the property owner/developer of record for Mark IV Summit II Management Office T.I., per its TDLR project registration.
Spencer-Pierce Architecture + Interiors is the design firm of record for Mark IV Summit II Management Office T.I., according to its TDLR filing.
Mark IV Summit II Management Office T.I. has an estimated construction value of $100K and approximately 1,151 square feet (about $87/sqft), based on its TDLR filing.
Add break area, new offices and conference room.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jun 30, 2020
Review Complete
Inspection Complete
Closed
Nov 20, 2020
Building permits found at or near this location
200A Service Upgrade with EV Charger
Express: Tub-shower conversion replace 416 sqft of siding replace GFCIs outlets in kitchen and bathroom add drain pump from kitchen sink and run 60 ln ft of 2 pvc from pump to main drain line
Express: Tub-shower conversion replace 416 sqft of siding replace GFCIs outlets in kitchen and bathroom add drain pump from kitchen sink and run 60 ln ft of 2 pvc from pump to main drain line
New 2-story single family residence 4 bed/3.5 bath attached garage covered porch and covered patio Green Building
Express: Tub-shower conversion replace 416 sqft of siding replace GFCIs outlets in kitchen and bathroom add drain pump from kitchen sink and run 60 ln ft of 2 pvc from pump to main drain line