Project intelligenceTDLR TABS2020020142Additions to Existing Building
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

New Middle School Classroom Addition in Portland, TX

4200 Wildcat Drive, Portland, TX, 78737

Construction complete · Jun 2022Project Closed

New Middle School Classroom Addition is a additions to existing building project at 4200 Wildcat Drive, Portland, in San Patricio County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2022). The project has an estimated value of $7.8M across about 40,334 sq ft.

Estimated project value
$7.8M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
40,334 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$193/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 9mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 7, 2020723 days across supplied datesJun 30, 2022

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    85 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    638 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78737 (Portland)

One email per change. Unsubscribe in one click. Privacy.

New Middle School Classroom Addition is a Additions to Existing Building project located at 4200 Wildcat Drive, Portland, TX 78737 in Portland, Texas. The project has an estimated value of $7.8M covering 40,334 sq ft. Gregory-Portland ISD is the property owner and Rawley McCoy & Associates, PLLC is the design firm of record. The project was registered with TDLR on July 7, 2020.

Frequently Asked Questions

What is New Middle School Classroom Addition?

New Middle School Classroom Addition is a additions to existing building project at 4200 Wildcat Drive in Portland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Addition of new two story conventional framed structure to New Middle School. Steel and Masonry construction with Masonry veneer. Project consists of additional classrooms, science lab, and mechanical spaces.

Is New Middle School Classroom Addition open in Portland?

Construction on New Middle School Classroom Addition is complete — TDLR records show the project passed its required accessibility inspection in Jun 2022. The building is finished and very likely open.

Where is New Middle School Classroom Addition located?

New Middle School Classroom Addition is located at 4200 Wildcat Drive, Portland, TX, 78737, in San Patricio County.

Who is the owner or developer of New Middle School Classroom Addition?

Gregory-Portland ISD is the property owner/developer of record for New Middle School Classroom Addition, per its TDLR project registration.

Who is the architect or design firm for New Middle School Classroom Addition?

Rawley McCoy & Associates, PLLC is the design firm of record for New Middle School Classroom Addition, according to its TDLR filing.

How much does New Middle School Classroom Addition cost and how big is it?

New Middle School Classroom Addition has an estimated construction value of $7.8M and approximately 40,334 square feet (about $193/sqft), based on its TDLR filing.

Scope of Work

Addition of new two story conventional framed structure to New Middle School. Steel and Masonry construction with Masonry veneer. Project consists of additional classrooms, science lab, and mechanical spaces.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

4200 Wildcat Drive, Portland, TX, 78737

Loading location map…
27.89112, -97.32068

Watch all construction in 78737 (Portland)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Portland?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.