Project intelligenceTDLR TABS2020020868Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

Clear Creek Community Church Parking Lot Re-Pave in League City, TX

999 FM 270, League City, TX, 77573

Target date passed (Aug 2020)Review Complete

Clear Creek Community Church Parking Lot Re-Pave is a renovation/alteration project at 999 FM 270, League City, in Galveston County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2020 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $132K across about 23,400 sq ft.

Estimated project value
$132K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
23,400 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$6/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 21, 202037 days across supplied datesAug 27, 2020

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    6 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    31 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77573 (League City)

One email per change. Unsubscribe in one click. Privacy.

Clear Creek Community Church Parking Lot Re-Pave is a Renovation/Alteration project located at 999 FM 270, League City, TX 77573 in League City, Texas. The project has an estimated value of $132K covering 23,400 sq ft. CLEAR CREEK COMM CHURCH is the property owner and Shelmark Engineering is the design firm of record. The project was registered with TDLR on July 21, 2020.

Frequently Asked Questions

What is Clear Creek Community Church Parking Lot Re-Pave?

Clear Creek Community Church Parking Lot Re-Pave is a renovation/alteration project at 999 FM 270 in League City, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Re-surfacing portion of existing parking lot.

Is Clear Creek Community Church Parking Lot Re-Pave open in League City?

Clear Creek Community Church Parking Lot Re-Pave was scheduled to finish construction in Aug 2020 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Clear Creek Community Church Parking Lot Re-Pave located?

Clear Creek Community Church Parking Lot Re-Pave is located at 999 FM 270, League City, TX, 77573, in Galveston County.

Who is the owner or developer of Clear Creek Community Church Parking Lot Re-Pave?

CLEAR CREEK COMM CHURCH is the property owner/developer of record for Clear Creek Community Church Parking Lot Re-Pave, per its TDLR project registration.

Who is the architect or design firm for Clear Creek Community Church Parking Lot Re-Pave?

Shelmark Engineering is the design firm of record for Clear Creek Community Church Parking Lot Re-Pave, according to its TDLR filing.

How much does Clear Creek Community Church Parking Lot Re-Pave cost and how big is it?

Clear Creek Community Church Parking Lot Re-Pave has an estimated construction value of $132K and approximately 23,400 square feet (about $6/sqft), based on its TDLR filing.

Scope of Work

Re-surfacing portion of existing parking lot.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

999 FM 270, League City, TX, 77573

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77573 (League City)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in League City?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.