Project intelligenceTDLR TABS2020021813Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

US 90 SIDEWALK AND LANDSCAPE IMPROVEMENT

US 90 Underpass at Steves, Roosevelt, & S. Presa, San Antonio, TX, 78210

Construction complete · Dec 2021Project Closed

US 90 SIDEWALK AND LANDSCAPE IMPROVEMENT is a renovation/alteration project at US 90 Underpass at Steves, Roosevelt, & S. Presa, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2021). The project has an estimated value of $450K across about 84,000 sq ft.

Estimated project value
$450K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
84,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$5/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 6, 2020482 days across supplied datesDec 1, 2021

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    117 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    365 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78210 (San Antonio)

One email per change. Unsubscribe in one click. Privacy.

US 90 SIDEWALK AND LANDSCAPE IMPROVEMENT is a Renovation/Alteration project located at US 90 Underpass at Steves, Roosevelt, & S. Presa, San Antonio, TX 78210 in San Antonio, Texas. The project has an estimated value of $450K covering 84,000 sq ft. CITY OF SAN ANTONIO PWD is the property owner and IDCUS is the design firm of record. The project was registered with TDLR on August 6, 2020.

Frequently Asked Questions

What is US 90 SIDEWALK AND LANDSCAPE IMPROVEMENT?

US 90 SIDEWALK AND LANDSCAPE IMPROVEMENT is a renovation/alteration project at US 90 Underpass at Steves, Roosevelt, & S. Presa in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Sidewalk, Landscaping, and art feature

Is US 90 SIDEWALK AND LANDSCAPE IMPROVEMENT open in San Antonio?

Construction on US 90 SIDEWALK AND LANDSCAPE IMPROVEMENT is complete — TDLR records show the project passed its required accessibility inspection in Dec 2021. The building is finished and very likely open.

Where is US 90 SIDEWALK AND LANDSCAPE IMPROVEMENT located?

US 90 SIDEWALK AND LANDSCAPE IMPROVEMENT is located at US 90 Underpass at Steves, Roosevelt, & S. Presa, San Antonio, TX, 78210, in Bexar County.

Who is the owner or developer of US 90 SIDEWALK AND LANDSCAPE IMPROVEMENT?

CITY OF SAN ANTONIO PWD is the property owner/developer of record for US 90 SIDEWALK AND LANDSCAPE IMPROVEMENT, per its TDLR project registration.

Who is the architect or design firm for US 90 SIDEWALK AND LANDSCAPE IMPROVEMENT?

IDCUS is the design firm of record for US 90 SIDEWALK AND LANDSCAPE IMPROVEMENT, according to its TDLR filing.

How much does US 90 SIDEWALK AND LANDSCAPE IMPROVEMENT cost and how big is it?

US 90 SIDEWALK AND LANDSCAPE IMPROVEMENT has an estimated construction value of $450K and approximately 84,000 square feet (about $5/sqft), based on its TDLR filing.

Scope of Work

Sidewalk, Landscaping, and art feature

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

US 90 Underpass at Steves, Roosevelt, & S. Presa, San Antonio, TX, 78210

Location by street address

Watch all construction in 78210 (San Antonio)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in San Antonio?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.