Sunflower Bank
Sunflower Bank is a renovation/alteration project at 8117 Preston Road Suite 250, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2020). The project has an estimated value of $75K across about 5,004 sq ft.
๐Project Metrics
TDLR #TABS2020022437Project Closed
Project has been completed and closed
Sunflower Bank is a Renovation/Alteration project located at 8117 Preston Road Suite 250, Dallas, TX 75225 in Dallas, Texas. The project has an estimated value of $75K covering 5,004 sq ft. KBS is the property owner and Entos is the design firm of record. The project was registered with TDLR on August 19, 2020.
โFrequently Asked Questions
What is Sunflower Bank?
Sunflower Bank is a renovation/alteration project at 8117 Preston Road Suite 250 in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Combine and renovate existing suites 240 and 250
Is Sunflower Bank open in Dallas?
Construction on Sunflower Bank is complete โ TDLR records show the project passed its required accessibility inspection in Nov 2020. The building is finished and very likely open.
Where is Sunflower Bank located?
Sunflower Bank is located at 8117 Preston Road Suite 250, Dallas, TX, 75225, in Dallas County.
Who is the owner or developer of Sunflower Bank?
KBS is the property owner/developer of record for Sunflower Bank, per its TDLR project registration.
Who is the architect or design firm for Sunflower Bank?
Entos is the design firm of record for Sunflower Bank, according to its TDLR filing.
How much does Sunflower Bank cost and how big is it?
Sunflower Bank has an estimated construction value of $75K and approximately 5,004 square feet (about $15/sqft), based on its TDLR filing.
๐Scope of Work
Combine and renovate existing suites 240 and 250
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 19, 2020
Review Complete
Inspection Complete
Closed
Nov 2, 2020