Project intelligenceTDLR TABS2021000061Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

MISD Elementary School RO Water Implementation-Ph 1 in Midland, TX

5001 Preston Drive, Midland, TX, 79707

Construction complete · Dec 2020Project Closed

MISD Elementary School RO Water Implementation-Ph 1 is a renovation/alteration project at 5001 Preston Drive, Midland, in Midland County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2020). The project has an estimated value of $61K across about 63,000 sq ft.

Estimated project value
$61K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
63,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$1/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 1, 202091 days across supplied datesDec 1, 2020

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    30 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    61 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79707 (Midland)

One email per change. Unsubscribe in one click. Privacy.

MISD Elementary School RO Water Implementation-Ph 1 is a Renovation/Alteration project located at 5001 Preston Drive, Midland, TX 79707 in Midland, Texas. The project has an estimated value of $61K covering 63,000 sq ft. Midland Independent School District - Darrell Dodds is the property owner and Agnew Associates, Inc is the design firm of record. The project was registered with TDLR on September 1, 2020.

Frequently Asked Questions

What is MISD Elementary School RO Water Implementation-Ph 1?

MISD Elementary School RO Water Implementation-Ph 1 is a renovation/alteration project at 5001 Preston Drive in Midland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Add central reverse osmosis system and extend reverse osmosis water piping to various locations for consumption. Replace electric water coolers with new water coolers with bottle fill stations.

Is MISD Elementary School RO Water Implementation-Ph 1 open in Midland?

Construction on MISD Elementary School RO Water Implementation-Ph 1 is complete — TDLR records show the project passed its required accessibility inspection in Dec 2020. The building is finished and very likely open.

Where is MISD Elementary School RO Water Implementation-Ph 1 located?

MISD Elementary School RO Water Implementation-Ph 1 is located at 5001 Preston Drive, Midland, TX, 79707, in Midland County.

Who is the owner or developer of MISD Elementary School RO Water Implementation-Ph 1?

Midland Independent School District - Darrell Dodds is the property owner/developer of record for MISD Elementary School RO Water Implementation-Ph 1, per its TDLR project registration.

Who is the architect or design firm for MISD Elementary School RO Water Implementation-Ph 1?

Agnew Associates, Inc is the design firm of record for MISD Elementary School RO Water Implementation-Ph 1, according to its TDLR filing.

How much does MISD Elementary School RO Water Implementation-Ph 1 cost and how big is it?

MISD Elementary School RO Water Implementation-Ph 1 has an estimated construction value of $61K and approximately 63,000 square feet (about $1/sqft), based on its TDLR filing.

Scope of Work

Add central reverse osmosis system and extend reverse osmosis water piping to various locations for consumption. Replace electric water coolers with new water coolers with bottle fill stations.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

5001 Preston Drive, Midland, TX, 79707

32.00992, -102.15210

Watch all construction in 79707 (Midland)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.