Houston Methodist Deer Park Emergency Care Clinic is a renovation/alteration project at 3701 Center Street, Deer Park, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2020). The project has an estimated value of $336K across about 6,577 sq ft.
Project has been completed and closed
Houston Methodist Deer Park Emergency Care Clinic is a Renovation/Alteration project located at 3701 Center Street, Deer Park, TX 77536 in Deer Park, Texas. The project has an estimated value of $336K covering 6,577 sq ft. Houston Methodist Hospital is the property owner and Page Southerland Page, Inc. is the design firm of record. The project was registered with TDLR on September 2, 2020.
Houston Methodist Deer Park Emergency Care Clinic is a renovation/alteration project at 3701 Center Street in Deer Park, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: interior renovation of an existing emergency care clinic
Construction on Houston Methodist Deer Park Emergency Care Clinic is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2020. The building is finished and very likely open.
Houston Methodist Deer Park Emergency Care Clinic is located at 3701 Center Street, Deer Park, TX, 77536, in Harris County.
Houston Methodist Hospital is the property owner/developer of record for Houston Methodist Deer Park Emergency Care Clinic, per its TDLR project registration.
Page Southerland Page, Inc. is the design firm of record for Houston Methodist Deer Park Emergency Care Clinic, according to its TDLR filing.
Houston Methodist Deer Park Emergency Care Clinic has an estimated construction value of $336K and approximately 6,577 square feet (about $51/sqft), based on its TDLR filing.
interior renovation of an existing emergency care clinic
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Sep 2, 2020
Review Complete
Inspection Complete
Closed
Dec 31, 2020