Project intelligenceTDLR TABS2021000679New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

IH 35 EAST & WEST FRONTAGE ROADS

Nueces River Bridge (EFR) To: IH 35/BI 35C N Int, Laredo, TX, 78014

Construction complete · Feb 2022Project Closed

IH 35 EAST & WEST FRONTAGE ROADS is a new construction project at Nueces River Bridge (EFR) To: IH 35/BI 35C N Int, Laredo, in La Salle County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2022). The project has an estimated value of $711K across about 80,859 sq ft.

Estimated project value
$711K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
80,859 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$9/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 14, 2020505 days across supplied datesFeb 1, 2022

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    140 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    365 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78014 (Laredo)

One email per change. Unsubscribe in one click. Privacy.

IH 35 EAST & WEST FRONTAGE ROADS is a New Construction project located at Nueces River Bridge (EFR) To: IH 35/BI 35C N Int, Laredo, TX 78014 in Laredo, Texas. The project has an estimated value of $711K covering 80,859 sq ft. TxDOT District: Laredo` is the property owner and Dannenbaum Engineering Corporation is the design firm of record. The project was registered with TDLR on September 14, 2020.

Frequently Asked Questions

What is IH 35 EAST & WEST FRONTAGE ROADS?

IH 35 EAST & WEST FRONTAGE ROADS is a new construction project at Nueces River Bridge (EFR) To: IH 35/BI 35C N Int in Laredo, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Rehabilitate Existing Roadway with sidewalks, ADA ramps, pedestrian rails and pedestrian signal poles.

Is IH 35 EAST & WEST FRONTAGE ROADS open in Laredo?

Construction on IH 35 EAST & WEST FRONTAGE ROADS is complete — TDLR records show the project passed its required accessibility inspection in Feb 2022. The building is finished and very likely open.

Where is IH 35 EAST & WEST FRONTAGE ROADS located?

IH 35 EAST & WEST FRONTAGE ROADS is located at Nueces River Bridge (EFR) To: IH 35/BI 35C N Int, Laredo, TX, 78014, in La Salle County.

Who is the owner or developer of IH 35 EAST & WEST FRONTAGE ROADS?

TxDOT District: Laredo` is the property owner/developer of record for IH 35 EAST & WEST FRONTAGE ROADS, per its TDLR project registration.

Who is the architect or design firm for IH 35 EAST & WEST FRONTAGE ROADS?

Dannenbaum Engineering Corporation is the design firm of record for IH 35 EAST & WEST FRONTAGE ROADS, according to its TDLR filing.

How much does IH 35 EAST & WEST FRONTAGE ROADS cost and how big is it?

IH 35 EAST & WEST FRONTAGE ROADS has an estimated construction value of $711K and approximately 80,859 square feet (about $9/sqft), based on its TDLR filing.

Scope of Work

Rehabilitate Existing Roadway with sidewalks, ADA ramps, pedestrian rails and pedestrian signal poles.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Nueces River Bridge (EFR) To: IH 35/BI 35C N Int, Laredo, TX, 78014

27.59552, -99.49476

Related Projects

Same Design Firm

$354.7M total

Watch all construction in 78014 (Laredo)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.