Valvoline Instant Oil Change
Valvoline Instant Oil Change is a new construction project at 651 N US 183, Building F, Leander, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2021). The project has an estimated value of $1.2M across about 3,776 sq ft.
๐Project Metrics
TDLR #TABS2021000782Project Closed
Project has been completed and closed
Valvoline Instant Oil Change is a New Construction project located at 651 N US 183, Building F, Leander, TX 78641 in Leander, Texas. The project has an estimated value of $1.2M covering 3,776 sq ft. Valvoline is the property owner and HFA is the design firm of record. The project was registered with TDLR on September 15, 2020.
โFrequently Asked Questions
What is Valvoline Instant Oil Change?
Valvoline Instant Oil Change is a new construction project at 651 N US 183, Building F in Leander, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of a new Valvoline Instant Oil Change
Is Valvoline Instant Oil Change open in Leander?
Construction on Valvoline Instant Oil Change is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2021. The building is finished and very likely open.
Where is Valvoline Instant Oil Change located?
Valvoline Instant Oil Change is located at 651 N US 183, Building F, Leander, TX, 78641, in Williamson County.
Who is the owner or developer of Valvoline Instant Oil Change?
Valvoline is the property owner/developer of record for Valvoline Instant Oil Change, per its TDLR project registration.
Who is the architect or design firm for Valvoline Instant Oil Change?
HFA is the design firm of record for Valvoline Instant Oil Change, according to its TDLR filing.
How much does Valvoline Instant Oil Change cost and how big is it?
Valvoline Instant Oil Change has an estimated construction value of $1.2M and approximately 3,776 square feet (about $318/sqft), based on its TDLR filing.
๐Scope of Work
Construction of a new Valvoline Instant Oil Change
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 15, 2020
Review Complete
Inspection Complete
Closed
Aug 15, 2021
๐Related Projects
๐คSame Owner
$36.3M total๐Related City Permits
Building permits found at or near this location
Residential Add on of Battery to the Residents Existing Roof Mounted Solar System
Express: Foundation repair (install 12 exterior pilings)
**EMERGENCY SPOT REPAIR ON THE GAS SYSTEM; GAS PURVEYOR CAME AND PUT A LOCK ON THE GAS AND TURNED OFF- WE NEED GAS PERMIT INSPECTION IN ORDER TO RELEASE LOCK FOR SERVICE RESTORATION** (CRAWFORD ELECTRIC)
Replacement of complete existing central heat and air system with or without duct work HVAC change out
Replacement of complete existing central heat and air system with or without duct work 2.5 TON (15 SEER) COMPLETE HORIZ GAS SYSTEM FOR U/S UNIT.
Property Owner
Design Firm
Registered Accessibility Specialist
Williamson County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Williamson County
Find General Contractors in Williamson