Project intelligenceTDLR TABS2021002650New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Sidewalk Package 1, Phase 1 - FY20-21

2121 Sage Rd, Suite 150, Houston, TX, 77056

Construction complete · May 2021Project Closed

Sidewalk Package 1, Phase 1 - FY20-21 is a new construction project at 2121 Sage Rd, Suite 150, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2021). The project has an estimated value of $512K across about 85,000 sq ft.

Estimated project value
$512K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
85,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$6/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 16, 2020206 days across supplied datesMay 10, 2021

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    24 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    182 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77056 (Houston)

One email per change. Unsubscribe in one click. Privacy.

Sidewalk Package 1, Phase 1 - FY20-21 is a New Construction project located at 2121 Sage Rd, Suite 150, Houston, TX 77056 in Houston, Texas. The project has an estimated value of $512K covering 85,000 sq ft. Harris County Engineering Department is the property owner and Aurora Technical Services is the design firm of record. The project was registered with TDLR on October 16, 2020.

Frequently Asked Questions

What is Sidewalk Package 1, Phase 1 - FY20-21?

Sidewalk Package 1, Phase 1 - FY20-21 is a new construction project at 2121 Sage Rd, Suite 150 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construct multiple sidewalk segments in Precinct 3 of the Harris County around Birkes Elementary, Aragon Middle School, Holmsley Elementary, and Langham Creek High School for phase I segments (B1, B3, B4, B6, B7, H1, H2, H4, H5, H6, H9A)

Is Sidewalk Package 1, Phase 1 - FY20-21 open in Houston?

Construction on Sidewalk Package 1, Phase 1 - FY20-21 is complete — TDLR records show the project passed its required accessibility inspection in May 2021. The building is finished and very likely open.

Where is Sidewalk Package 1, Phase 1 - FY20-21 located?

Sidewalk Package 1, Phase 1 - FY20-21 is located at 2121 Sage Rd, Suite 150, Houston, TX, 77056, in Harris County.

Who is the owner or developer of Sidewalk Package 1, Phase 1 - FY20-21?

Harris County Engineering Department is the property owner/developer of record for Sidewalk Package 1, Phase 1 - FY20-21, per its TDLR project registration.

Who is the architect or design firm for Sidewalk Package 1, Phase 1 - FY20-21?

Aurora Technical Services is the design firm of record for Sidewalk Package 1, Phase 1 - FY20-21, according to its TDLR filing.

How much does Sidewalk Package 1, Phase 1 - FY20-21 cost and how big is it?

Sidewalk Package 1, Phase 1 - FY20-21 has an estimated construction value of $512K and approximately 85,000 square feet (about $6/sqft), based on its TDLR filing.

Scope of Work

Construct multiple sidewalk segments in Precinct 3 of the Harris County around Birkes Elementary, Aragon Middle School, Holmsley Elementary, and Langham Creek High School for phase I segments (B1, B3, B4, B6, B7, H1, H2, H4, H5, H6, H9A)

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2121 Sage Rd, Suite 150, Houston, TX, 77056

Location by street address

Watch all construction in 77056 (Houston)