EL Camino Sidewalks Replacement Project from Holly hall to El Rio Street, Precinct 1, UPIN: 20101MF
El Camino Street between Holly hall and El Rio, Houston, TX, 77054
EL Camino Sidewalks Replacement Project from Holly hall to El Rio Street, Precinct 1, UPIN: 20101MF is a renovation/alteration project at El Camino Street between Holly hall and El Rio, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Oct 2021 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $280K across about 22,800 sq ft.
- Estimated project value
- $280K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 22,800 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $12/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 6 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
200 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
171 days after the preceding date shown.
Source: TDLR filing
View source record
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77054 (Houston)
One email per change. Unsubscribe in one click. Privacy.
EL Camino Sidewalks Replacement Project from Holly hall to El Rio Street, Precinct 1, UPIN: 20101MF is a Renovation/Alteration project located at El Camino Street between Holly hall and El Rio, Houston, TX 77054 in Houston, Texas. The project has an estimated value of $280K covering 22,800 sq ft. Harris County Engineering Department is the property owner. The project was registered with TDLR on October 23, 2020.
Frequently Asked Questions
What is EL Camino Sidewalks Replacement Project from Holly hall to El Rio Street, Precinct 1, UPIN: 20101MF?
EL Camino Sidewalks Replacement Project from Holly hall to El Rio Street, Precinct 1, UPIN: 20101MF is a renovation/alteration project at El Camino Street between Holly hall and El Rio in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Existing sidewalk replacement and new sidewalks construction
Is EL Camino Sidewalks Replacement Project from Holly hall to El Rio Street, Precinct 1, UPIN: 20101MF open in Houston?
EL Camino Sidewalks Replacement Project from Holly hall to El Rio Street, Precinct 1, UPIN: 20101MF was scheduled to finish construction in Oct 2021 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is EL Camino Sidewalks Replacement Project from Holly hall to El Rio Street, Precinct 1, UPIN: 20101MF located?
EL Camino Sidewalks Replacement Project from Holly hall to El Rio Street, Precinct 1, UPIN: 20101MF is located at El Camino Street between Holly hall and El Rio, Houston, TX, 77054, in Harris County.
Who is the owner or developer of EL Camino Sidewalks Replacement Project from Holly hall to El Rio Street, Precinct 1, UPIN: 20101MF?
Harris County Engineering Department is the property owner/developer of record for EL Camino Sidewalks Replacement Project from Holly hall to El Rio Street, Precinct 1, UPIN: 20101MF, per its TDLR project registration.
How much does EL Camino Sidewalks Replacement Project from Holly hall to El Rio Street, Precinct 1, UPIN: 20101MF cost and how big is it?
EL Camino Sidewalks Replacement Project from Holly hall to El Rio Street, Precinct 1, UPIN: 20101MF has an estimated construction value of $280K and approximately 22,800 square feet (about $12/sqft), based on its TDLR filing.
Scope of Work
Existing sidewalk replacement and new sidewalks construction
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
El Camino Street between Holly hall and El Rio, Houston, TX, 77054
Watch all construction in 77054 (Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Houston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.