Project intelligenceTDLR TABS2021003104Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

EL Camino Sidewalks Replacement Project from Holly hall to El Rio Street, Precinct 1, UPIN: 20101MF

El Camino Street between Holly hall and El Rio, Houston, TX, 77054

Target date passed (Oct 2021)Project Registered

EL Camino Sidewalks Replacement Project from Holly hall to El Rio Street, Precinct 1, UPIN: 20101MF is a renovation/alteration project at El Camino Street between Holly hall and El Rio, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Oct 2021 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $280K across about 22,800 sq ft.

Estimated project value
$280K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
22,800 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$12/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 23, 2020371 days across supplied datesOct 29, 2021

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    200 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    171 days after the preceding date shown.

    Source: TDLR filing

    View source record

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77054 (Houston)

One email per change. Unsubscribe in one click. Privacy.

EL Camino Sidewalks Replacement Project from Holly hall to El Rio Street, Precinct 1, UPIN: 20101MF is a Renovation/Alteration project located at El Camino Street between Holly hall and El Rio, Houston, TX 77054 in Houston, Texas. The project has an estimated value of $280K covering 22,800 sq ft. Harris County Engineering Department is the property owner. The project was registered with TDLR on October 23, 2020.

Frequently Asked Questions

What is EL Camino Sidewalks Replacement Project from Holly hall to El Rio Street, Precinct 1, UPIN: 20101MF?

EL Camino Sidewalks Replacement Project from Holly hall to El Rio Street, Precinct 1, UPIN: 20101MF is a renovation/alteration project at El Camino Street between Holly hall and El Rio in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Existing sidewalk replacement and new sidewalks construction

Is EL Camino Sidewalks Replacement Project from Holly hall to El Rio Street, Precinct 1, UPIN: 20101MF open in Houston?

EL Camino Sidewalks Replacement Project from Holly hall to El Rio Street, Precinct 1, UPIN: 20101MF was scheduled to finish construction in Oct 2021 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is EL Camino Sidewalks Replacement Project from Holly hall to El Rio Street, Precinct 1, UPIN: 20101MF located?

EL Camino Sidewalks Replacement Project from Holly hall to El Rio Street, Precinct 1, UPIN: 20101MF is located at El Camino Street between Holly hall and El Rio, Houston, TX, 77054, in Harris County.

Who is the owner or developer of EL Camino Sidewalks Replacement Project from Holly hall to El Rio Street, Precinct 1, UPIN: 20101MF?

Harris County Engineering Department is the property owner/developer of record for EL Camino Sidewalks Replacement Project from Holly hall to El Rio Street, Precinct 1, UPIN: 20101MF, per its TDLR project registration.

How much does EL Camino Sidewalks Replacement Project from Holly hall to El Rio Street, Precinct 1, UPIN: 20101MF cost and how big is it?

EL Camino Sidewalks Replacement Project from Holly hall to El Rio Street, Precinct 1, UPIN: 20101MF has an estimated construction value of $280K and approximately 22,800 square feet (about $12/sqft), based on its TDLR filing.

Scope of Work

Existing sidewalk replacement and new sidewalks construction

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

El Camino Street between Holly hall and El Rio, Houston, TX, 77054

Location by street address

Watch all construction in 77054 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.