Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Southwest Regional Park Remote Restroom in Leander, TX
219 Perry Mayfield Blvd, Leander, TX, 78641
Southwest Regional Park Remote Restroom is a renovation/alteration project at 219 Perry Mayfield Blvd, Leander, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2022). The project has an estimated value of $250K across about 3,000 sq ft.
- Estimated project value
- $250K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 3,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $83/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 2mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
108 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
423 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78641 (Leander)
One email per change. Unsubscribe in one click. Privacy.
Southwest Regional Park Remote Restroom is a Renovation/Alteration project located at 219 Perry Mayfield Blvd, Leander, TX 78641 in Leander, Texas. The project has an estimated value of $250K covering 3,000 sq ft. Williamson County is the property owner and Studio16:19 is the design firm of record. The project was registered with TDLR on December 17, 2020.
Frequently Asked Questions
What is Southwest Regional Park Remote Restroom?
Southwest Regional Park Remote Restroom is a renovation/alteration project at 219 Perry Mayfield Blvd in Leander, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: This project will consist of the addition of a pre-fabricated restroom facility within an existing parking lot.
Is Southwest Regional Park Remote Restroom open in Leander?
Construction on Southwest Regional Park Remote Restroom is complete — TDLR records show the project passed its required accessibility inspection in Jun 2022. The building is finished and very likely open.
Where is Southwest Regional Park Remote Restroom located?
Southwest Regional Park Remote Restroom is located at 219 Perry Mayfield Blvd, Leander, TX, 78641, in Williamson County.
Who is the owner or developer of Southwest Regional Park Remote Restroom?
Williamson County is the property owner/developer of record for Southwest Regional Park Remote Restroom, per its TDLR project registration.
Who is the architect or design firm for Southwest Regional Park Remote Restroom?
Studio16:19 is the design firm of record for Southwest Regional Park Remote Restroom, according to its TDLR filing.
How much does Southwest Regional Park Remote Restroom cost and how big is it?
Southwest Regional Park Remote Restroom has an estimated construction value of $250K and approximately 3,000 square feet (about $83/sqft), based on its TDLR filing.
Scope of Work
This project will consist of the addition of a pre-fabricated restroom facility within an existing parking lot.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
219 Perry Mayfield Blvd, Leander, TX, 78641
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$96.2M totalSame Design Firm
$750K totalRelated City Permits
Building permits found at or near this location
New 2-Story Duplex Condominium. Unit 7A to have (2) Bedrooms (2.5) Bathrooms (1) Attached Garage (1) Attached Covered Carport Covered Entry Porch Uncovered Balcony. Plan Type E Units 7A & 7B: 219 Lessin Lane Building #7A +7B Building Height 25ft-5 Maximum Height: 35ft. Required Parking 2. Required FFE: 640.5- above MSL. Site Plan#: SP-2020-0364C. Expiration Date:10/24/2024
New 2-Story Condominium. Unit to have (2) Bedrooms (2.5) Bathrooms (1) Attached Garage (1) Uncovered Parking Covered Entry Porch (1) Covered Balcony. Plan Type F: 219 Lessin Lane Building # 5 Elevation R. Building Height 23ft-8 Maximum Height: 35ft. Required Parking 2. Required FFE: 640.50- above MSL. Site Plan#: SP-2020-0364C. Expiration Date:10/24/2024
rebuild existing service. install trans-socket meter 400 amps install new fuse disconnect
New 2-Story Condominium. Unit to have (3) Bedrooms (3.5) Bathrooms (1) Attached Garage(1) Covered Carport (1) Uncovered Parking Covered Entry Porch (1) Uncovered Balcony Uncovered Patio Uncovered Deck Plan Type A: 219 Lessin Lane Building # 9. Building Height 23ft-8¿ Maximum Height: 35ft. Required Parking 3. Required FFE: 639.50- above MSL. Site Plan#: SP-2020-0364C. Expiration Date:10/24/2024
New 3-Story Condominium Unit to have (2) Bedrooms (2.5) Bathrooms (1) Detached Carport (1) Uncovered Parking Covered Entry Porch (2) Covered Balconies. Plan Type J: 219 Lessin Lane Building #1 Building Height 34ft-4 1/2 Maximum Height: 35ft. Required Parking 2. Required FFE: 642.5- above MSL. Site Plan#: SP-2020-0364C. Expiration Date: 10/24/2024
Watch all construction in 78641 (Leander)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Leander?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.