Project intelligenceTDLR TABS2021009243New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

SBCISD Natatorium Facility

845 8th Street, San Benito, TX, 78586

Target date passed (Dec 2024)Review Complete

SBCISD Natatorium Facility is a new construction project at 845 8th Street, San Benito, in Cameron County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Dec 2024 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $5.0M across about 19,019 sq ft.

Estimated project value
$5.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
19,019 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$263/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3y 11mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 10, 20211,420 days across supplied datesDec 31, 2024

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    19 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    1,401 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78586 (San Benito)

One email per change. Unsubscribe in one click. Privacy.

SBCISD Natatorium Facility is a New Construction project located at 845 8th Street, San Benito, TX 78586 in San Benito, Texas. The project has an estimated value of $5.0M covering 19,019 sq ft. San Benito Consolidated Independent School District is the property owner and ROFA Architects is the design firm of record. The project was registered with TDLR on February 10, 2021.

Frequently Asked Questions

What is SBCISD Natatorium Facility?

SBCISD Natatorium Facility is a new construction project at 845 8th Street in San Benito, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Natatorium will have 25 meters competition swimming pool. Alternate No. 1 will include a warm up pool. The facility will include spectators, restrooms, and boys and girls dressing rooms and restrooms.

Is SBCISD Natatorium Facility open in San Benito?

SBCISD Natatorium Facility was scheduled to finish construction in Dec 2024 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is SBCISD Natatorium Facility located?

SBCISD Natatorium Facility is located at 845 8th Street, San Benito, TX, 78586, in Cameron County.

Who is the owner or developer of SBCISD Natatorium Facility?

San Benito Consolidated Independent School District is the property owner/developer of record for SBCISD Natatorium Facility, per its TDLR project registration.

Who is the architect or design firm for SBCISD Natatorium Facility?

ROFA Architects is the design firm of record for SBCISD Natatorium Facility, according to its TDLR filing.

How much does SBCISD Natatorium Facility cost and how big is it?

SBCISD Natatorium Facility has an estimated construction value of $5.0M and approximately 19,019 square feet (about $263/sqft), based on its TDLR filing.

Scope of Work

Natatorium will have 25 meters competition swimming pool. Alternate No. 1 will include a warm up pool. The facility will include spectators, restrooms, and boys and girls dressing rooms and restrooms.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

845 8th Street, San Benito, TX, 78586

Location by street address

Watch all construction in 78586 (San Benito)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in San Benito?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.