Zabalist
ZabalistTexas Construction
๐Ÿ  Home
๐Ÿ“‹ Directory
๐Ÿ’Ž Pricing๐Ÿ“Š Data
Sign InCreate Account
Zabalist
ZabalistTexas Construction

The most comprehensive Texas construction intelligence platform. Search verified contractors, track permits, and explore projects across the state.

โœ“ Verified DataFree to Search

Directory

  • Contractors
  • Builders
  • Architects
  • Developers
  • Property Owners

Construction Data

  • Building Permits
  • State Projects
  • Site Plans
  • Texas RFPs & Bids
  • Browse by City
  • Browse by County

Free Tools

  • Contractor License Lookup
  • Permit Cost Estimator
  • Free Contractor Badges
  • About Zabalist
  • Contact Us

ยฉ 2026 Smart Austin LLC d/b/a Moon Sherpa Labs. All rights reserved.

TermsPrivacyCookiesDo Not SellAccessibilityDMCAData Sources
Data from verified public sources. Not affiliated with any government agency.
  1. Home
  2. /
  3. Projects
  4. /
  5. Travis
Construction complete ยท Jul 2021๐ŸProject Closed๐Ÿ”ง Renovation/Alteration๐Ÿ’ต This project involves public funds, public land, or is a Federally funded roadway project.

UT SSB Restroom Renovations 2 and 3

100 W Dean Keeton, Austin, TX 78712, Austin, TX, 78712
Completed100%

๐Ÿ“ŠProject Metrics

TDLR #TABS2021009375
$500K
Project Value
1,060
Square Feet
$472/sqft
Cost/SqFt
5 months
Duration
Registered:Feb 12, 2021
Start:Mar 15, 2021
Target:Jul 31, 2021
๐Ÿ

Project Closed

Project has been completed and closed

UT SSB Restroom Renovations 2 and 3 is a Renovation/Alteration project located at 100 W Dean Keeton, Austin, TX 78712 in Austin, Texas. The project has an estimated value of $500K covering 1,060 sq ft. The University of Texas at Austin is the property owner and Pfluger Architects is the design firm of record. The project was registered with TDLR on February 12, 2021.

๐Ÿ“‹Scope of Work

Renovation of second and third floor restrooms.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
February 12, 2021
Project Closed
July 31, 2021
Construction Start
March 15, 2021
Expected Completion
July 31, 2021

๐Ÿ“…Project Timeline

Filed

Feb 12, 2021

Review Complete

Inspection Complete

Closed

Jul 31, 2021

๐Ÿ”—Related Projects

๐Ÿ‘คSame Owner

$5.6M total
CP1006704 - UT Dinosaur Trackways Building
Austinยท$4.2M
George Washington Monument - Landscape Enhancements
Austinยท$150K
ART - Sculpture Studio & Grad Studio Renovation
Austinยท$882K
Add Four Offices to 2.150 (BEG CP2000250)
Austinยท$329K

๐Ÿ›๏ธSame Design Firm

$72.2M total
Leander Elementary #32
Leanderยท$65.0M
Ladera Elementary Portable Infrastructure
San Antonioยท$370K
Hilltop ES Capital Bond Improvements
Argyleยท$2.0M
Argyle ISD 377 Campus- Auditorium and Athletics
Argyleยท$4.8M

๐Ÿ“„Related City Permits

Building permits found at or near this location

1008 BRICKELL LOOP UNIT A

Home builders loop Ref: 2026-015217 EP

FinalElectrical PermitHomebuilder LoopJun 2026
View Details
2026-065814 EP
๐Ÿ”งIn Charge Electrical Services
1008 BRICKELL LOOP UNIT B

Home builders loop Ref: 2026-015218 EP

FinalElectrical PermitHomebuilder LoopJun 2026
View Details
2026-065813 EP
๐Ÿ”งIn Charge Electrical Services
1008 SPENCE ST BLDG 2

BLDG #2 New 2-Story dwelling unit 2 Bed/2 Bath with attached carports covered patio and balcony new alley driveway (Two Unit Use)

ActiveElectrical PermitNewJun 2026
View Details
2024-134720 EP
๐Ÿ”งAtex Electrical Services
1008 SPENCE ST

Addition/remodel. 2-story addition to existing noncomplying 1-story dwelling unit. Addition will consist of an enlarged living room enlarged kitchen utility room half bathroom and covered patio to 1st floor and three bedrooms and two bathrooms to 2nd floor. Reconfigure interior layout resulting in a 3 bedroom 2.5 bathroom dwelling unit.

ActiveElectrical PermitAddition and RemodelJun 2026
View Details
2024-146356 EP
๐Ÿ”งAtex Electrical Services
1008 HARWOOD PL

Updated: meter pull to cut power requiring only the temporary pull of the meter itself. There will be no manipulation or removal of the meter can enclosure or service wires from transformer to meter whatsoever. We only need to pull the meter itself to cut power to the wires feeding the homes main panel in order to install the battery disconnect upstream of the homes main panel. Remove meter to cut power to the house. Replace main panel and install electrical automatic transfer switch for subsequent battery backup system install. Reinstall meter to re-establish power to the house.

ActiveElectrical PermitRepairJun 2026
View Details
2026-063987 EP
๐Ÿ”งMGR Services LLC

Quick Actions

View on TDLR
TDLR ID: TABS2021009375

Property Owner

๐Ÿ‘ค
The University of Texas at Austin
4 projects ยท $5.6M
View all projects
1301 E. Dean Keeton, Austin, Texas 78712
(512) 471-1715

Design Firm

๐Ÿ›๏ธ
Pfluger Architects
4 projects ยท $72.2M
View all projects
209 E. Riverside Dr., Austin, Texas 78704
(512) 476-4040

Registered Accessibility Specialist

๐Ÿ“‹
ARTURO ALEXANDER OCHOA,PINERO
RAS #1551
10800 LAKELINE BLVD APT 13207, AUSTIN, TX 78717
(512) 771-9225

Explore Area

๐Ÿ™๏ธ
Austin
View city projects
๐Ÿ—บ๏ธ
Travis County
View county projects
๐Ÿ“ฎ
ZIP 78712
View zip code projects

Find Professionals

๐Ÿ”จ
Contractors in Austin
Licensed contractors directory
๐Ÿ—๏ธ
Builders in Austin
Home & commercial builders
๐Ÿ“
Architects in Austin
Architecture & design firms

Get alerts for Travis

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists
Explore All Projects