Project intelligenceTDLR TABS2021009446Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

IMPROVEMENTS TO BAMMEL RD. FROM IMPERIAL VALLEY DR. TO WEST HARDY RD.

711 1/2 BAMMEL RD., Houston, TX, 77073

Target date passed (Feb 2022)Review Complete

IMPROVEMENTS TO BAMMEL RD. FROM IMPERIAL VALLEY DR. TO WEST HARDY RD. is a renovation/alteration project at 711 1/2 BAMMEL RD., Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Feb 2022 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $235K across about 23,760 sq ft.

Estimated project value
$235K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
23,760 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$10/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 16, 2021350 days across supplied datesFeb 1, 2022

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    258 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    92 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77073 (Houston)

One email per change. Unsubscribe in one click. Privacy.

IMPROVEMENTS TO BAMMEL RD. FROM IMPERIAL VALLEY DR. TO WEST HARDY RD. is a Renovation/Alteration project located at 711 1/2 BAMMEL RD., Houston, TX 77073 in Houston, Texas. The project has an estimated value of $235K covering 23,760 sq ft. HARRIS COUNTY is the property owner and IMS ENGINEERS INC. is the design firm of record. The project was registered with TDLR on February 16, 2021.

Frequently Asked Questions

What is IMPROVEMENTS TO BAMMEL RD. FROM IMPERIAL VALLEY DR. TO WEST HARDY RD.?

IMPROVEMENTS TO BAMMEL RD. FROM IMPERIAL VALLEY DR. TO WEST HARDY RD. is a renovation/alteration project at 711 1/2 BAMMEL RD. in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: CONSTRUCTION OF 6' SIDEWALK ALONG BOTH SIDES OF IMPERIAL VALLEY DR. AND CONSTRUCTION OF 6'-8' SIDEWALK ALONG THE SOUTH SIDE OF BAMMEL RD.

Is IMPROVEMENTS TO BAMMEL RD. FROM IMPERIAL VALLEY DR. TO WEST HARDY RD. open in Houston?

IMPROVEMENTS TO BAMMEL RD. FROM IMPERIAL VALLEY DR. TO WEST HARDY RD. was scheduled to finish construction in Feb 2022 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is IMPROVEMENTS TO BAMMEL RD. FROM IMPERIAL VALLEY DR. TO WEST HARDY RD. located?

IMPROVEMENTS TO BAMMEL RD. FROM IMPERIAL VALLEY DR. TO WEST HARDY RD. is located at 711 1/2 BAMMEL RD., Houston, TX, 77073, in Harris County.

Who is the owner or developer of IMPROVEMENTS TO BAMMEL RD. FROM IMPERIAL VALLEY DR. TO WEST HARDY RD.?

HARRIS COUNTY is the property owner/developer of record for IMPROVEMENTS TO BAMMEL RD. FROM IMPERIAL VALLEY DR. TO WEST HARDY RD., per its TDLR project registration.

Who is the architect or design firm for IMPROVEMENTS TO BAMMEL RD. FROM IMPERIAL VALLEY DR. TO WEST HARDY RD.?

IMS ENGINEERS INC. is the design firm of record for IMPROVEMENTS TO BAMMEL RD. FROM IMPERIAL VALLEY DR. TO WEST HARDY RD., according to its TDLR filing.

How much does IMPROVEMENTS TO BAMMEL RD. FROM IMPERIAL VALLEY DR. TO WEST HARDY RD. cost and how big is it?

IMPROVEMENTS TO BAMMEL RD. FROM IMPERIAL VALLEY DR. TO WEST HARDY RD. has an estimated construction value of $235K and approximately 23,760 square feet (about $10/sqft), based on its TDLR filing.

Scope of Work

CONSTRUCTION OF 6' SIDEWALK ALONG BOTH SIDES OF IMPERIAL VALLEY DR. AND CONSTRUCTION OF 6'-8' SIDEWALK ALONG THE SOUTH SIDE OF BAMMEL RD.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Watch all construction in 77073 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Get alerts for Harris

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists