Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Riverwood Middle School Weight Room Addition
2910 High Valley Dr, Humble, TX, 77345
Riverwood Middle School Weight Room Addition is a additions to existing building project at 2910 High Valley Dr, Humble, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jun 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $619K across about 1,987 sq ft.
- Estimated project value
- $619K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 1,987 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $312/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 5y 1mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
88 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
1,826 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77345 (Humble)
One email per change. Unsubscribe in one click. Privacy.
Riverwood Middle School Weight Room Addition is a Additions to Existing Building project located at 2910 High Valley Dr, Humble, TX 77345 in Humble, Texas. The project has an estimated value of $619K covering 1,987 sq ft. Humble ISD is the property owner and BRW Architects is the design firm of record. The project was registered with TDLR on March 5, 2021.
Frequently Asked Questions
What is Riverwood Middle School Weight Room Addition?
Riverwood Middle School Weight Room Addition is a additions to existing building project at 2910 High Valley Dr in Humble, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: A building addition housing a new weight room to an existing school building. Construction will be unprotected steel post-and-beam framing, non-combustible non-load bearing masonry and a single-ply membrane roof on structural metal deck.
Is Riverwood Middle School Weight Room Addition open in Humble?
Riverwood Middle School Weight Room Addition was scheduled to finish construction in Jun 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Riverwood Middle School Weight Room Addition located?
Riverwood Middle School Weight Room Addition is located at 2910 High Valley Dr, Humble, TX, 77345, in Harris County.
Who is the owner or developer of Riverwood Middle School Weight Room Addition?
Humble ISD is the property owner/developer of record for Riverwood Middle School Weight Room Addition, per its TDLR project registration.
Who is the architect or design firm for Riverwood Middle School Weight Room Addition?
BRW Architects is the design firm of record for Riverwood Middle School Weight Room Addition, according to its TDLR filing.
How much does Riverwood Middle School Weight Room Addition cost and how big is it?
Riverwood Middle School Weight Room Addition has an estimated construction value of $619K and approximately 1,987 square feet (about $312/sqft), based on its TDLR filing.
Scope of Work
A building addition housing a new weight room to an existing school building. Construction will be unprotected steel post-and-beam framing, non-combustible non-load bearing masonry and a single-ply membrane roof on structural metal deck.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
2910 High Valley Dr, Humble, TX, 77345
Related Projects
Same Owner
$2.7M totalWatch all construction in 77345 (Humble)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Humble?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.