Funding type
This project is privately funded, on private land for private use.
Harvest Meadows Amenity Center
587 Fieldwood Drive, Buda, TX, 78610
Harvest Meadows Amenity Center is a new construction project at 587 Fieldwood Drive, Buda, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Oct 2021 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $1.3M across about 53,580 sq ft.
- Estimated project value
- $1.3M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 53,580 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $24/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 5 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
49 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
151 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Harvest Meadows Amenity Center
The Harvest Meadows Amenity Center is a new construction project located at 587 Fieldwood Drive in Buda, Texas. This facility serves as a shared amenity park within the Harvest Meadows townhome development. The scope of work includes a swimming pool, a restroom building, a playground, and a dog park. The total estimated cost for this project is $1,300,000.
Gehan Homes is the owner and developer of record. The project is privately funded and situated on private land for private use. It is registered with the Texas Department of Licensing and Regulation (TDLR). The registration was completed in March 2021, and plan review was finalized in the same month. The scheduled construction start date was May 2021, with a planned completion date of October 2021.
The site covers 53,580 square feet. The calculated cost per square foot is $24. This figure is below the county median of $115 per square foot for similar new construction filings in Hays County. The estimated total cost of $1,300,000 is above the county median of $950,000. The scheduled build window of 151 days is shorter than the county median of 274 days.
This classification indicates a lower risk of flooding compared to areas within designated flood zones. The project is part of a broader development effort by Gehan Homes, which has other TDLR-registered projects in Leander, including Deerbrooke Phase 2 Sections 6 and 7. These other projects are marked as closed in the public record.
TDLR has not yet recorded a final inspection for the Harvest Meadows Amenity Center. Therefore, the current state of the site is not confirmed in the public record. The completion date on the filing has passed, but the lack of a final inspection record means the status remains unverified in the TDLR database. Readers should note that construction status and business opening are distinct, and the record only covers construction milestones.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78610 (Buda)
One email per change. Unsubscribe in one click. Privacy.
Harvest Meadows Amenity Center is a New Construction project located at 587 Fieldwood Drive, Buda, TX 78610 in Buda, Texas. The project has an estimated value of $1.3M covering 53,580 sq ft. Gehan Homes is the property owner. The project was registered with TDLR on March 15, 2021.
Frequently Asked Questions
Is the Harvest Meadows Amenity Center open?
The TDLR record does not confirm the site is open. TDLR has not yet recorded a final inspection, so the current operational status is not verified in the public record.
Who owns the Harvest Meadows Amenity Center?
Gehan Homes is the owner and developer of record. The project is privately funded and located on private land for private use within the townhome development.
What amenities are included in the project?
The scope includes a swimming pool, a restroom building, a playground, and a dog park. It is designed as an amenity park for the townhome residents.
What is the estimated cost of the project?
The estimated cost is $1,300,000. This amount is above the Hays County median for new construction filings, which is $950,000.
When was the project scheduled for completion?
The filing listed October 2021 as the completion date. However, TDLR has not yet recorded a final inspection, so the actual completion status is unconfirmed.
What is Harvest Meadows Amenity Center?
Harvest Meadows Amenity Center is a new construction project at 587 Fieldwood Drive in Buda, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Amenity park in a townhome development that includes pool, restroom building, playground and dog park.
Is Harvest Meadows Amenity Center open in Buda?
Harvest Meadows Amenity Center was scheduled to finish construction in Oct 2021 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Harvest Meadows Amenity Center located?
Harvest Meadows Amenity Center is located at 587 Fieldwood Drive, Buda, TX, 78610, in Hays County.
Who is the owner or developer of Harvest Meadows Amenity Center?
Gehan Homes is the property owner/developer of record for Harvest Meadows Amenity Center, per its TDLR project registration.
How much does Harvest Meadows Amenity Center cost and how big is it?
Harvest Meadows Amenity Center has an estimated construction value of $1.3M and approximately 53,580 square feet (about $24/sqft), based on its TDLR filing.
Scope of Work
Amenity park in a townhome development that includes pool, restroom building, playground and dog park.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
587 Fieldwood Drive, Buda, TX, 78610
Related Projects
Related City Permits
Building permits found at or near this location
Connect mobile home.
Connect mobile home.
Connect mobile home.
Install 8x8 front deck 4x4 back deck & connect mobile home.
Connect mobile home only
Watch all construction in 78610 (Buda)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Buda?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.