UTMDA Clark Kitchen Cooler Replacement - Phase 2
1515 Holcombe Blvd., Houston, TX, 77030
UTMDA Clark Kitchen Cooler Replacement - Phase 2 is a renovation/alteration project at 1515 Holcombe Blvd., Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2027. The project has an estimated value of $900K across about 2,500 sq ft.
- Estimated project value
- $900K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 2,500 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $360/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 7y 7mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Scheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Source: TDLR filing
View source recordProject registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
260 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
2,479 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77030 (Houston)
One email per change. Unsubscribe in one click. Privacy.
UTMDA Clark Kitchen Cooler Replacement - Phase 2 is a Renovation/Alteration project located at 1515 Holcombe Blvd., Houston, TX 77030 in Houston, Texas. The project has an estimated value of $900K covering 2,500 sq ft. UTMDA is the property owner and Perkins and Will is the design firm of record. The project was registered with TDLR on March 18, 2021.
Frequently Asked Questions
What is UTMDA Clark Kitchen Cooler Replacement - Phase 2?
UTMDA Clark Kitchen Cooler Replacement - Phase 2 is a renovation/alteration project at 1515 Holcombe Blvd. in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replacement of three freezer/coolers located on level 1 at UT MD Anderson main Texas Medical Center campus.
Is UTMDA Clark Kitchen Cooler Replacement - Phase 2 open in Houston?
UTMDA Clark Kitchen Cooler Replacement - Phase 2 is still under construction in Houston, TX, with an estimated completion of Dec 2027 according to its TDLR registration.
Where is UTMDA Clark Kitchen Cooler Replacement - Phase 2 located?
UTMDA Clark Kitchen Cooler Replacement - Phase 2 is located at 1515 Holcombe Blvd., Houston, TX, 77030, in Harris County.
Who is the owner or developer of UTMDA Clark Kitchen Cooler Replacement - Phase 2?
UTMDA is the property owner/developer of record for UTMDA Clark Kitchen Cooler Replacement - Phase 2, per its TDLR project registration.
Who is the architect or design firm for UTMDA Clark Kitchen Cooler Replacement - Phase 2?
Perkins and Will is the design firm of record for UTMDA Clark Kitchen Cooler Replacement - Phase 2, according to its TDLR filing.
How much does UTMDA Clark Kitchen Cooler Replacement - Phase 2 cost and how big is it?
UTMDA Clark Kitchen Cooler Replacement - Phase 2 has an estimated construction value of $900K and approximately 2,500 square feet (about $360/sqft), based on its TDLR filing.
Scope of Work
Replacement of three freezer/coolers located on level 1 at UT MD Anderson main Texas Medical Center campus.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1515 Holcombe Blvd., Houston, TX, 77030
Related Projects
Same Owner
$10.8M totalWatch all construction in 77030 (Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Houston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.