Project intelligenceTDLR TABS2021011884New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Avenue S Reconstruction from 53rd to Seawall Blvd

2427 53rd Street, Galveston, TX, 77551

Target date passed (May 2021)Review Complete

Avenue S Reconstruction from 53rd to Seawall Blvd is a new construction project at 2427 53rd Street, Galveston, in Galveston County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish May 2021 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $9.3M across about 449,580 sq ft.

Estimated project value
$9.3M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
449,580 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$21/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 6mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 15, 2019533 days across supplied datesMay 1, 2021

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    495 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    38 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77551 (Galveston)

One email per change. Unsubscribe in one click. Privacy.

Avenue S Reconstruction from 53rd to Seawall Blvd is a New Construction project located at 2427 53rd Street, Galveston, TX 77551 in Galveston, Texas. The project has an estimated value of $9.3M covering 449,580 sq ft. Galveston County is the property owner and Binkley & Barfield, Inc is the design firm of record. The project was registered with TDLR on March 24, 2021.

Frequently Asked Questions

What is Avenue S Reconstruction from 53rd to Seawall Blvd?

Avenue S Reconstruction from 53rd to Seawall Blvd is a new construction project at 2427 53rd Street in Galveston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Reconstruction of Avenue S from 53rd Street to Seawall Blvd. Including pavement reconstruction, storm sewer, sidewalks, ADA ramps, water and sanitary, SWPPP and tree protection.

Is Avenue S Reconstruction from 53rd to Seawall Blvd open in Galveston?

Avenue S Reconstruction from 53rd to Seawall Blvd was scheduled to finish construction in May 2021 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Avenue S Reconstruction from 53rd to Seawall Blvd located?

Avenue S Reconstruction from 53rd to Seawall Blvd is located at 2427 53rd Street, Galveston, TX, 77551, in Galveston County.

Who is the owner or developer of Avenue S Reconstruction from 53rd to Seawall Blvd?

Galveston County is the property owner/developer of record for Avenue S Reconstruction from 53rd to Seawall Blvd, per its TDLR project registration.

Who is the architect or design firm for Avenue S Reconstruction from 53rd to Seawall Blvd?

Binkley & Barfield, Inc is the design firm of record for Avenue S Reconstruction from 53rd to Seawall Blvd, according to its TDLR filing.

How much does Avenue S Reconstruction from 53rd to Seawall Blvd cost and how big is it?

Avenue S Reconstruction from 53rd to Seawall Blvd has an estimated construction value of $9.3M and approximately 449,580 square feet (about $21/sqft), based on its TDLR filing.

Scope of Work

Reconstruction of Avenue S from 53rd Street to Seawall Blvd. Including pavement reconstruction, storm sewer, sidewalks, ADA ramps, water and sanitary, SWPPP and tree protection.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Watch all construction in 77551 (Galveston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Get alerts for Galveston

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists