Level 9
Level 9 is a renovation/alteration project at 575 N Dairy Ashford Rd, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2021). The project has an estimated value of $120K across about 24,259 sq ft.
๐Project Metrics
TDLR #TABS2021014265Project Closed
Project has been completed and closed
Level 9 is a Renovation/Alteration project located at 575 N Dairy Ashford Rd, Houston, TX 77079 in Houston, Texas. The project has an estimated value of $120K covering 24,259 sq ft. CBRE is the property owner and JZ Interior Design is the design firm of record. The project was registered with TDLR on April 27, 2021.
โFrequently Asked Questions
What is Level 9?
Level 9 is a renovation/alteration project at 575 N Dairy Ashford Rd in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Removal of existing offices and associated power/data as shown on plans.
Is Level 9 open in Houston?
Construction on Level 9 is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2021. The building is finished and very likely open.
Where is Level 9 located?
Level 9 is located at 575 N Dairy Ashford Rd, Houston, TX, 77079, in Harris County.
Who is the owner or developer of Level 9?
CBRE is the property owner/developer of record for Level 9, per its TDLR project registration.
Who is the architect or design firm for Level 9?
JZ Interior Design is the design firm of record for Level 9, according to its TDLR filing.
How much does Level 9 cost and how big is it?
Level 9 has an estimated construction value of $120K and approximately 24,259 square feet (about $5/sqft), based on its TDLR filing.
๐Scope of Work
Removal of existing offices and associated power/data as shown on plans.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 27, 2021
Review Complete
Inspection Complete
Closed
Sep 1, 2021