TRU-FIT EXPRESSWAY 83/ is a renovation/alteration project at 301D E. EXPRESSWAY 83, Mission, in Hidalgo County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2021). The project has an estimated value of $1.5M across about 33,447 sq ft.
Project has been completed and closed
TRU-FIT EXPRESSWAY 83/ is a Renovation/Alteration project located at 301D E. EXPRESSWAY 83, Mission, TX 78572 in Mission, Texas. The project has an estimated value of $1.5M covering 33,447 sq ft. B-Y Mission Texas WM LTD is the property owner and CHANIN ENGINEERING is the design firm of record. The project was registered with TDLR on April 29, 2021.
TRU-FIT EXPRESSWAY 83/ is a renovation/alteration project at 301D E. EXPRESSWAY 83 in Mission, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: RENOVATION OF EXISTING SHELL TO ACCOMMODATE AN ATHLETIC CLUB EQUIPPED FOR FITNESS ACTIVITIES.
Construction on TRU-FIT EXPRESSWAY 83/ is complete โ TDLR records show the project passed its required accessibility inspection in Nov 2021. The building is finished and very likely open.
TRU-FIT EXPRESSWAY 83/ is located at 301D E. EXPRESSWAY 83, Mission, TX, 78572, in Hidalgo County.
B-Y Mission Texas WM LTD is the property owner/developer of record for TRU-FIT EXPRESSWAY 83/, per its TDLR project registration.
CHANIN ENGINEERING is the design firm of record for TRU-FIT EXPRESSWAY 83/, according to its TDLR filing.
TRU-FIT EXPRESSWAY 83/ has an estimated construction value of $1.5M and approximately 33,447 square feet (about $45/sqft), based on its TDLR filing.
RENOVATION OF EXISTING SHELL TO ACCOMMODATE AN ATHLETIC CLUB EQUIPPED FOR FITNESS ACTIVITIES.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Apr 29, 2021
Review Complete
Inspection Complete
Closed
Nov 30, 2021