J-Prime Steakhouse is a renovation/alteration project at 301 Brazos St., Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $2.2M across about 9,700 sq ft.
Design review complete, construction may proceed
J-Prime Steakhouse is a Renovation/Alteration project located at 301 Brazos St., Austin, TX 78707 in Austin, Texas. The project has an estimated value of $2.2M covering 9,700 sq ft. KRE Longhorn Owner, LLC is the property owner and RB Architecture, PLLC is the design firm of record. The project was registered with TDLR on June 2, 2021.
J-Prime Steakhouse is a renovation/alteration project at 301 Brazos St. in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel Work (Interior & Front Elevation)
J-Prime Steakhouse is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
J-Prime Steakhouse is located at 301 Brazos St., Austin, TX, 78707, in Travis County.
KRE Longhorn Owner, LLC is the property owner/developer of record for J-Prime Steakhouse, per its TDLR project registration.
RB Architecture, PLLC is the design firm of record for J-Prime Steakhouse, according to its TDLR filing.
J-Prime Steakhouse has an estimated construction value of $2.2M and approximately 9,700 square feet (about $227/sqft), based on its TDLR filing.
Remodel Work (Interior & Front Elevation)
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jun 2, 2021
Review Complete
Jun 2, 2021
Inspection Complete
Closed
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
Construct new driveway approach of 12 FT. No sidewalk inspection per plan review.
Construct new driveway approach of 8 FT. Driveway approach is from the alley.
Replacement of complete existing central heat and air system with or without duct work
Install one illuminated double sided monument sign for THE INDEPENDENT