LPC Pilot Plant
LPC Pilot Plant is a renovation/alteration project at 4494 Campbell Rd., Houston, in Hemphill County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2023). The project has an estimated value of $1.2M across about 950 sq ft.
๐Project Metrics
TDLR #TABS2021017188Project Closed
Project has been completed and closed
LPC Pilot Plant is a Renovation/Alteration project located at 4494 Campbell Rd., Houston, TX 77041 in Houston, Texas. The project has an estimated value of $1.2M covering 950 sq ft. Aker Biomarine Manufacturing is the property owner and Jacobs Wyper Architects is the design firm of record. The project was registered with TDLR on June 7, 2021.
โFrequently Asked Questions
What is LPC Pilot Plant?
LPC Pilot Plant is a renovation/alteration project at 4494 Campbell Rd. in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Alteration to an existing warehouse. New Process/manuf. room and small adjacent lab with shared vestibule to be created as part of existing warehouse space.
Is LPC Pilot Plant open in Houston?
Construction on LPC Pilot Plant is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2023. The building is finished and very likely open.
Where is LPC Pilot Plant located?
LPC Pilot Plant is located at 4494 Campbell Rd., Houston, TX, 77041, in Hemphill County.
Who is the owner or developer of LPC Pilot Plant?
Aker Biomarine Manufacturing is the property owner/developer of record for LPC Pilot Plant, per its TDLR project registration.
Who is the architect or design firm for LPC Pilot Plant?
Jacobs Wyper Architects is the design firm of record for LPC Pilot Plant, according to its TDLR filing.
How much does LPC Pilot Plant cost and how big is it?
LPC Pilot Plant has an estimated construction value of $1.2M and approximately 950 square feet (about $1.26K/sqft), based on its TDLR filing.
๐Scope of Work
Alteration to an existing warehouse. New Process/manuf. room and small adjacent lab with shared vestibule to be created as part of existing warehouse space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 7, 2021
Review Complete
Inspection Complete
Closed
Dec 1, 2023