Project intelligenceTDLR TABS2021019301Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

Shipley Do-Nuts - Plum Creek

4520 S. FM 1626, Suite 100, Kyle, TX, 78640

Construction complete · Dec 2021Inspection Complete

Shipley Do-Nuts - Plum Creek is a renovation/alteration project at 4520 S. FM 1626, Suite 100, Kyle, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2021). The project has an estimated value of $189K across about 2,000 sq ft.

Estimated project value
$189K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
2,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$95/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 7, 2021152 days across supplied datesDec 6, 2021

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    30 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    122 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78640 (Kyle)

One email per change. Unsubscribe in one click. Privacy.

Shipley Do-Nuts - Plum Creek is a Renovation/Alteration project located at 4520 S. FM 1626, Suite 100, Kyle, TX 78640 in Kyle, Texas. The project has an estimated value of $189K covering 2,000 sq ft. S-SI Plum Creek, LP is the property owner and Oculus Inc. is the design firm of record. The project was registered with TDLR on July 7, 2021.

Frequently Asked Questions

What is Shipley Do-Nuts - Plum Creek?

Shipley Do-Nuts - Plum Creek is a renovation/alteration project at 4520 S. FM 1626, Suite 100 in Kyle, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior fit-out of a cold, dark shell for a grab & go do-nut shop

Is Shipley Do-Nuts - Plum Creek open in Kyle?

Construction on Shipley Do-Nuts - Plum Creek is complete — TDLR records show the project passed its required accessibility inspection in Dec 2021. The building is finished and very likely open.

Where is Shipley Do-Nuts - Plum Creek located?

Shipley Do-Nuts - Plum Creek is located at 4520 S. FM 1626, Suite 100, Kyle, TX, 78640, in Hays County.

Who is the owner or developer of Shipley Do-Nuts - Plum Creek?

S-SI Plum Creek, LP is the property owner/developer of record for Shipley Do-Nuts - Plum Creek, per its TDLR project registration.

Who is the architect or design firm for Shipley Do-Nuts - Plum Creek?

Oculus Inc. is the design firm of record for Shipley Do-Nuts - Plum Creek, according to its TDLR filing.

How much does Shipley Do-Nuts - Plum Creek cost and how big is it?

Shipley Do-Nuts - Plum Creek has an estimated construction value of $189K and approximately 2,000 square feet (about $95/sqft), based on its TDLR filing.

Scope of Work

Interior fit-out of a cold, dark shell for a grab & go do-nut shop

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

4520 S. FM 1626, Suite 100, Kyle, TX, 78640

Location by street address

Related City Permits

Building permits found at or near this location

4520 SAN SIMEON DR

Replacement of an existing water heater Change Out: Install/ Replace 40 gallon tank-type natural gas water heater.

FinalPlumbing PermitChange OutAug 2026
View Details
2026-101301 PP
Salt Light & Electric
4520 BENNETT AVE

Main gas leak repair.

ActivePlumbing PermitRepairJul 2026
View Details
2026-087763 PP
Cornerstone Plumbing and Mechanical
4520 BRIDAL VEIL DR

Irrigation for lawn

FinalPlumbing PermitIrrigationMay 2026
View Details
2026-060974 PP
4520 BRIDAL VEIL DR

Construct new driveway approach of 17 FT and sidewalk of 161 LF

FinalDriveway / SidewalksNewApr 2026
View Details
2026-027711 DS
4520 BRIDAL VEIL DR

Caprock S405 B Left New - 2 Story SFR w/ 5 bedrooms 3 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.

FinalMechanical PermitNewApr 2026
View Details
2026-027711 MP
IES Residential Inc

Watch all construction in 78640 (Kyle)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.