DEVINE LAKE PHASE 3 (CIVIL IMPROVEMENTS ONLY) in Leander, TX
WEST END SAN GABRIEL PARKWAY, Leander, TX, 78641
DEVINE LAKE PHASE 3 (CIVIL IMPROVEMENTS ONLY) is a new construction project at WEST END SAN GABRIEL PARKWAY, Leander, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2022). The project has an estimated value of $25K across about 11,468 sq ft.
- Estimated project value
- $25K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 11,468 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $2/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 7 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Scheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Source: TDLR filing
View source recordProject registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
8 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
205 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78641 (Leander)
One email per change. Unsubscribe in one click. Privacy.
DEVINE LAKE PHASE 3 (CIVIL IMPROVEMENTS ONLY) is a New Construction project located at WEST END SAN GABRIEL PARKWAY, Leander, TX 78641 in Leander, Texas. The project has an estimated value of $25K covering 11,468 sq ft. LENNAR HOMES OF TEXAS LAND AND CONSTRUCTION LTD is the property owner and LJA ENGINEERING INC is the design firm of record. The project was registered with TDLR on July 9, 2021.
Frequently Asked Questions
What is DEVINE LAKE PHASE 3 (CIVIL IMPROVEMENTS ONLY)?
DEVINE LAKE PHASE 3 (CIVIL IMPROVEMENTS ONLY) is a new construction project at WEST END SAN GABRIEL PARKWAY in Leander, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: CIVIL SITE IMPROVEMENTS FOR A SUBDIVISION CONSISTING OF A 93 SINGLE FAMILY LOTS AND 8 NON-RESIDENTIAL LOTS DEVELOPMENT ON 114,68 ACRES
Is DEVINE LAKE PHASE 3 (CIVIL IMPROVEMENTS ONLY) open in Leander?
Construction on DEVINE LAKE PHASE 3 (CIVIL IMPROVEMENTS ONLY) is complete — TDLR records show the project passed its required accessibility inspection in Jan 2022. The building is finished and very likely open.
Where is DEVINE LAKE PHASE 3 (CIVIL IMPROVEMENTS ONLY) located?
DEVINE LAKE PHASE 3 (CIVIL IMPROVEMENTS ONLY) is located at WEST END SAN GABRIEL PARKWAY, Leander, TX, 78641, in Williamson County.
Who is the owner or developer of DEVINE LAKE PHASE 3 (CIVIL IMPROVEMENTS ONLY)?
LENNAR HOMES OF TEXAS LAND AND CONSTRUCTION LTD is the property owner/developer of record for DEVINE LAKE PHASE 3 (CIVIL IMPROVEMENTS ONLY), per its TDLR project registration.
Who is the architect or design firm for DEVINE LAKE PHASE 3 (CIVIL IMPROVEMENTS ONLY)?
LJA ENGINEERING INC is the design firm of record for DEVINE LAKE PHASE 3 (CIVIL IMPROVEMENTS ONLY), according to its TDLR filing.
How much does DEVINE LAKE PHASE 3 (CIVIL IMPROVEMENTS ONLY) cost and how big is it?
DEVINE LAKE PHASE 3 (CIVIL IMPROVEMENTS ONLY) has an estimated construction value of $25K and approximately 11,468 square feet (about $2/sqft), based on its TDLR filing.
Scope of Work
CIVIL SITE IMPROVEMENTS FOR A SUBDIVISION CONSISTING OF A 93 SINGLE FAMILY LOTS AND 8 NON-RESIDENTIAL LOTS DEVELOPMENT ON 114,68 ACRES
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
WEST END SAN GABRIEL PARKWAY, Leander, TX, 78641
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$255.1M totalWatch all construction in 78641 (Leander)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Leander?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.