Project intelligenceTDLR TABS2021019686New Construction
Funding type

This project is privately funded, on private land for private use.

SAT14 - Phase 4 in San Antonio, TX

3545 Wiseman Boulevard, San Antonio, TX, 78251

Construction complete · May 2026Inspection Complete

SAT14 - Phase 4 is a new construction project at 3545 Wiseman Boulevard, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2026). The project has an estimated value of $27.2M across about 46,000 sq ft.

Estimated project value
$27.2M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
46,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$591/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4y 7mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 13, 20211,753 days across supplied datesMay 1, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    80 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    1,642 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    31 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About SAT14 - Phase 4

The SAT14 Data Center at 3545 Wiseman Boulevard in San Antonio is a new construction project completed by Microsoft. This facility features a 46,000 sq ft shell and a specific scope focused on the finish-out of one colocation unit within the existing structure. The project is now finished, having passed its final TDLR accessibility inspection in May 2026.

Microsoft, the owner of record, registered this project with the Texas Department of Licensing and Regulation (TDLR) in July 2021. The filing, identified as SAT14 - Phase 4, listed an estimated cost of $27,200,000. This valuation places the project in the top quarter of new construction filings in Bexar County, significantly above the county median of $600,000. The construction window spanned from October 2021 to the final inspection, a duration longer than the typical 208-day median build window for similar projects in the region.

Design and Construction Details

Page Southerland Page served as the design firm of record for this Microsoft facility. The firm has been involved in other high-profile projects, including the Fine Arts Building in Austin and facilities for Baylor College of Medicine. The construction was privately funded on private land, with no public funding sources indicated in the TDLR records.

Third-party data providers have noted the operational status of this site. For instance, datacenter.fyi lists the SAT14 Data Center as an operational facility with 43.1 MW of power capacity. Other sources, such as Baxtel, describe it as part of a broader network of Microsoft Azure data centers in the San Antonio area. These external reports align with the TDLR record confirming the completion of the physical construction phase.

The project's scale and cost reflect a specialized build rather than a standard commercial renovation. The $591 per square foot cost is above the county median of $115 per square foot, consistent with the high-intensity requirements of data center infrastructure. The completion of the final TDLR accessibility inspection in May 2026 marks the end of the construction and regulatory review process for this specific phase of the SAT14 campus.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78251 (San Antonio)

One email per change. Unsubscribe in one click. Privacy.

SAT14 - Phase 4 is a New Construction project located at 3545 Wiseman Boulevard, San Antonio, TX 78251 in San Antonio, Texas. The project has an estimated value of $27.2M covering 46,000 sq ft. Microsoft is the property owner and Page Southerland Page is the design firm of record. The project was registered with TDLR on July 13, 2021.

Frequently Asked Questions

Is the SAT14 Data Center construction complete?

Yes, the project passed its final TDLR accessibility inspection in May 2026. The TDLR status is listed as Inspection Complete, indicating the construction phase is finished.

Who owns the SAT14 Data Center?

Microsoft is the owner and developer of record for the project. The facility is located at 3545 Wiseman Boulevard in San Antonio.

What is the square footage of the project?

The project covers 46,000 sq ft. The scope of work involved the finish-out of one colocation unit within the shell facility.

What was the estimated cost of construction?

The estimated cost was $27,200,000. This figure is above the median cost for new construction projects in Bexar County.

When did construction start and finish?

Construction started in October 2021. The final TDLR accessibility inspection was passed in May 2026, marking the completion of the project.

What is SAT14 - Phase 4?

SAT14 - Phase 4 is a new construction project at 3545 Wiseman Boulevard in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Finish-out / fit-out of one colo of data center within shell facility.

Is SAT14 - Phase 4 open in San Antonio?

Construction on SAT14 - Phase 4 is complete — TDLR records show the project passed its required accessibility inspection in May 2026. The building is finished and very likely open.

Where is SAT14 - Phase 4 located?

SAT14 - Phase 4 is located at 3545 Wiseman Boulevard, San Antonio, TX, 78251, in Bexar County.

Who is the owner or developer of SAT14 - Phase 4?

Microsoft is the property owner/developer of record for SAT14 - Phase 4, per its TDLR project registration.

Who is the architect or design firm for SAT14 - Phase 4?

Page Southerland Page is the design firm of record for SAT14 - Phase 4, according to its TDLR filing.

How much does SAT14 - Phase 4 cost and how big is it?

SAT14 - Phase 4 has an estimated construction value of $27.2M and approximately 46,000 square feet (about $591/sqft), based on its TDLR filing.

Scope of Work

Finish-out / fit-out of one colo of data center within shell facility.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3545 Wiseman Boulevard, San Antonio, TX, 78251

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Related City Permits

Building permits found at or near this location

3545 WISEMAN BLVD, City of San Antonio, TX 78251

SP - Special Project - SAT14 Data Center Site Foundation & Shell - 3545 Wiseman Blvd., Bldgs 1-3 / Phased

IssuedComm Retaining Wall PermitNewSep 2026
$90.8M
SAT-COM-RW-PMT26-41100031
3545 WISEMAN BLVD, City of San Antonio, TX 78251

MS SAT 14

IssuedElectrical General PermitApr 2026
SAT-MEP-ELE-PMT26-33310508

Watch all construction in 78251 (San Antonio)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in San Antonio?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.