Project intelligenceTDLR TABS2021020350Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Midway ISD | Woodgate Intermediate School Renovations

9400 Chapel Road, Waco, TX, 76712

Construction complete · Aug 2022Project Closed

Midway ISD | Woodgate Intermediate School Renovations is a renovation/alteration project at 9400 Chapel Road, Waco, in McLennan County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2022). The project has an estimated value of $10.9M across about 80,752 sq ft.

Estimated project value
$10.9M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
80,752 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$136/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 21, 2021390 days across supplied datesAug 15, 2022

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    30 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    360 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76712 (Waco)

One email per change. Unsubscribe in one click. Privacy.

Midway ISD | Woodgate Intermediate School Renovations is a Renovation/Alteration project located at 9400 Chapel Road, Waco, TX 76712 in Waco, Texas. The project has an estimated value of $10.9M covering 80,752 sq ft. Midway ISD is the property owner and Huckabee is the design firm of record. The project was registered with TDLR on July 21, 2021.

Frequently Asked Questions

What is Midway ISD | Woodgate Intermediate School Renovations?

Midway ISD | Woodgate Intermediate School Renovations is a renovation/alteration project at 9400 Chapel Road in Waco, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Woodgate Intermediate School Renovations for Midway ISD.

Is Midway ISD | Woodgate Intermediate School Renovations open in Waco?

Construction on Midway ISD | Woodgate Intermediate School Renovations is complete — TDLR records show the project passed its required accessibility inspection in Aug 2022. The building is finished and very likely open.

Where is Midway ISD | Woodgate Intermediate School Renovations located?

Midway ISD | Woodgate Intermediate School Renovations is located at 9400 Chapel Road, Waco, TX, 76712, in McLennan County.

Who is the owner or developer of Midway ISD | Woodgate Intermediate School Renovations?

Midway ISD is the property owner/developer of record for Midway ISD | Woodgate Intermediate School Renovations, per its TDLR project registration.

Who is the architect or design firm for Midway ISD | Woodgate Intermediate School Renovations?

Huckabee is the design firm of record for Midway ISD | Woodgate Intermediate School Renovations, according to its TDLR filing.

How much does Midway ISD | Woodgate Intermediate School Renovations cost and how big is it?

Midway ISD | Woodgate Intermediate School Renovations has an estimated construction value of $10.9M and approximately 80,752 square feet (about $136/sqft), based on its TDLR filing.

Scope of Work

Woodgate Intermediate School Renovations for Midway ISD.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

9400 Chapel Road, Waco, TX, 76712

31.47993, -97.21608

Watch all construction in 76712 (Waco)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.