Project intelligenceTDLR TABS2021021990Additions to Existing Building
Funding type

This project is privately funded, on private land for private use.

Tuscany way Development – Building 2 – Tenant Finish Out Phase 1

9400 Tuscany Way, Austin, TX, 78710

Construction complete · Nov 2021Project Closed

Tuscany way Development – Building 2 – Tenant Finish Out Phase 1 is a additions to existing building project at 9400 Tuscany Way, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2021). The project has an estimated value of $2.4M across about 202,165 sq ft.

Estimated project value
$2.4M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
202,165 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$12/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 12, 202181 days across supplied datesNov 1, 2021

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    18 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    63 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78710 (Austin)

One email per change. Unsubscribe in one click. Privacy.

Tuscany way Development – Building 2 – Tenant Finish Out Phase 1 is a Additions to Existing Building project located at 9400 Tuscany Way, Austin, TX 78710 in Austin, Texas. The project has an estimated value of $2.4M covering 202,165 sq ft. Dalfen Industrial, LLC is the property owner and GSR Andrade Architects is the design firm of record. The project was registered with TDLR on August 12, 2021.

Frequently Asked Questions

What is Tuscany way Development – Building 2 – Tenant Finish Out Phase 1?

Tuscany way Development – Building 2 – Tenant Finish Out Phase 1 is a additions to existing building project at 9400 Tuscany Way in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Addition of restroom in an existing 202,165 SF tilt-wall industrial facility and minor warehouse improvements

Is Tuscany way Development – Building 2 – Tenant Finish Out Phase 1 open in Austin?

Construction on Tuscany way Development – Building 2 – Tenant Finish Out Phase 1 is complete — TDLR records show the project passed its required accessibility inspection in Nov 2021. The building is finished and very likely open.

Where is Tuscany way Development – Building 2 – Tenant Finish Out Phase 1 located?

Tuscany way Development – Building 2 – Tenant Finish Out Phase 1 is located at 9400 Tuscany Way, Austin, TX, 78710, in Travis County.

Who is the owner or developer of Tuscany way Development – Building 2 – Tenant Finish Out Phase 1?

Dalfen Industrial, LLC is the property owner/developer of record for Tuscany way Development – Building 2 – Tenant Finish Out Phase 1, per its TDLR project registration.

Who is the architect or design firm for Tuscany way Development – Building 2 – Tenant Finish Out Phase 1?

GSR Andrade Architects is the design firm of record for Tuscany way Development – Building 2 – Tenant Finish Out Phase 1, according to its TDLR filing.

How much does Tuscany way Development – Building 2 – Tenant Finish Out Phase 1 cost and how big is it?

Tuscany way Development – Building 2 – Tenant Finish Out Phase 1 has an estimated construction value of $2.4M and approximately 202,165 square feet (about $12/sqft), based on its TDLR filing.

Scope of Work

Addition of restroom in an existing 202,165 SF tilt-wall industrial facility and minor warehouse improvements

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

9400 Tuscany Way, Austin, TX, 78710

Location by street address

Related City Permits

Building permits found at or near this location

9400 CAPITOL VIEW DR

Austin Art in Public Places (ACME) new public artwork. (Fees Waived)

ActiveBuilding PermitNewSep 2026
$240K
View Details
2026-113791 BP
City of Austin Art in Public Places
9400 FURMAN DR

Construct new driveway approach of 17 FT and sidewalk of 33 LF

ActiveDriveway / SidewalksNewAug 2026
View Details
2026-075307 DS
9400 TOPRIDGE DR

Interior remodel updating kitchen bathroom and replacing windows and doors. This is a remodel of entire house. - add new sub panel & new main panel

ActiveBuilding PermitAddition and RemodelJul 2026
$1
View Details
2022-071245 BP
Heinz Construction Service
9400 JENARO CT

EV Charger installation: Install a new 60-amp circuit in the 100 Subanel and route wiring left /right of the panel to the interior side wall of the garage... Hardwire the Charge Point Home flex- J1772 And configure to draw up 48 amp continuous.

FinalElectrical PermitRepairJul 2026
View Details
2026-090487 EP
Mcleod Electric
9400 FURMAN DR

Homebuilders loop for New SFR ref 2026-075307 BP. Austin Full purpose

FinalElectrical PermitHomebuilder LoopJun 2026
View Details
2026-077995 EP
IES Residential, Inc.

Watch all construction in 78710 (Austin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.