Alvin Swift
Alvin Swift is a new construction project at 1900 N Gordon St, Alvin, in Brazoria County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2022). The project has an estimated value of $1.2M across about 5,044 sq ft.
๐Project Metrics
TDLR #TABS2021022035Project Closed
Project has been completed and closed
Alvin Swift is a New Construction project located at 1900 N Gordon St, Alvin, TX 77511 in Alvin, Texas. The project has an estimated value of $1.2M covering 5,044 sq ft. Adil Momin is the property owner and Mamko Design LLC is the design firm of record. The project was registered with TDLR on August 13, 2021.
โFrequently Asked Questions
What is Alvin Swift?
Alvin Swift is a new construction project at 1900 N Gordon St in Alvin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: A ground up construction of a single store gas station.
Is Alvin Swift open in Alvin?
Construction on Alvin Swift is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2022. The building is finished and very likely open.
Where is Alvin Swift located?
Alvin Swift is located at 1900 N Gordon St, Alvin, TX, 77511, in Brazoria County.
Who is the owner or developer of Alvin Swift?
Adil Momin is the property owner/developer of record for Alvin Swift, per its TDLR project registration.
Who is the architect or design firm for Alvin Swift?
Mamko Design LLC is the design firm of record for Alvin Swift, according to its TDLR filing.
How much does Alvin Swift cost and how big is it?
Alvin Swift has an estimated construction value of $1.2M and approximately 5,044 square feet (about $238/sqft), based on its TDLR filing.
๐Scope of Work
A ground up construction of a single store gas station.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 13, 2021
Review Complete
Inspection Complete
Closed
Apr 15, 2022
๐Related Projects
๐๏ธSame Design Firm
$3.3M totalProperty Owner
Design Firm
Registered Accessibility Specialist
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Brazoria County
Find General Contractors in Brazoria