HWE Workroom
HWE Workroom is a renovation/alteration project at 5501 West Parmer Lane Building 2, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2022). The project has an estimated value of $2.5M across about 4,551 sq ft.
๐Project Metrics
TDLR #TABS2021022717Project Closed
Project has been completed and closed
HWE Workroom is a Renovation/Alteration project located at 5501 West Parmer Lane Building 2, Austin, TX 78727 in Austin, Texas. The project has an estimated value of $2.5M covering 4,551 sq ft. Apple, Inc. is the property owner and Studio8 Architects is the design firm of record. The project was registered with TDLR on August 23, 2021.
โFrequently Asked Questions
What is HWE Workroom?
HWE Workroom is a renovation/alteration project at 5501 West Parmer Lane Building 2 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation to existing space with light mechanical, electrical, and plumbing work.
Is HWE Workroom open in Austin?
Construction on HWE Workroom is complete โ TDLR records show the project passed its required accessibility inspection in Feb 2022. The building is finished and very likely open.
Where is HWE Workroom located?
HWE Workroom is located at 5501 West Parmer Lane Building 2, Austin, TX, 78727, in Travis County.
Who is the owner or developer of HWE Workroom?
Apple, Inc. is the property owner/developer of record for HWE Workroom, per its TDLR project registration.
Who is the architect or design firm for HWE Workroom?
Studio8 Architects is the design firm of record for HWE Workroom, according to its TDLR filing.
How much does HWE Workroom cost and how big is it?
HWE Workroom has an estimated construction value of $2.5M and approximately 4,551 square feet (about $542/sqft), based on its TDLR filing.
๐Scope of Work
Renovation to existing space with light mechanical, electrical, and plumbing work.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 23, 2021
Review Complete
Inspection Complete
Closed
Feb 25, 2022
๐Related Projects
๐คSame Owner
$500.6M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
ELECTRIC AVE TATTOO
Express: Foundation repair
QT - DEMO OF INTERIOR WALLS ONLY TO BRING UNIT BACK TO WHITE BOX CONDITIONS. NO CHANGE TO EXTERIOR WALLS OR EXISTING PLUMBING ELECTRIC OR MECHANICAL AT EXISTING OFFICE - OVA
Replacement of complete existing central heat and air system with or without duct work