Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Sidewalk - Normandy Street from Woodforest Blvd. to Wallisville Rd.
Normandy St from Woodforest Blvd to Wallisville Rd, Houston, TX, 77015
Sidewalk - Normandy Street from Woodforest Blvd. to Wallisville Rd. is a new construction project at Normandy St from Woodforest Blvd to Wallisville Rd, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2022). The project has an estimated value of $606K across about 77,000 sq ft.
- Estimated project value
- $606K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 77,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $8/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 4 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
74 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
120 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77015 (Houston)
One email per change. Unsubscribe in one click. Privacy.
Sidewalk - Normandy Street from Woodforest Blvd. to Wallisville Rd. is a New Construction project located at Normandy St from Woodforest Blvd to Wallisville Rd, Houston, TX 77015 in Houston, Texas. The project has an estimated value of $606K covering 77,000 sq ft. Harris County Engineering Department is the property owner and AKV Consulting Engineers is the design firm of record. The project was registered with TDLR on September 3, 2021.
Frequently Asked Questions
What is Sidewalk - Normandy Street from Woodforest Blvd. to Wallisville Rd.?
Sidewalk - Normandy Street from Woodforest Blvd. to Wallisville Rd. is a new construction project at Normandy St from Woodforest Blvd to Wallisville Rd in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The project consists of the construction of new sidewalks for Normandy Street from Woodforest Blvd. to Wallisville Rd. along with relocation of utilities, signs, reconstruction of driveways, sidewalk ramps, curb and gutter, pavement mark…
Is Sidewalk - Normandy Street from Woodforest Blvd. to Wallisville Rd. open in Houston?
Construction on Sidewalk - Normandy Street from Woodforest Blvd. to Wallisville Rd. is complete — TDLR records show the project passed its required accessibility inspection in Mar 2022. The building is finished and very likely open.
Where is Sidewalk - Normandy Street from Woodforest Blvd. to Wallisville Rd. located?
Sidewalk - Normandy Street from Woodforest Blvd. to Wallisville Rd. is located at Normandy St from Woodforest Blvd to Wallisville Rd, Houston, TX, 77015, in Harris County.
Who is the owner or developer of Sidewalk - Normandy Street from Woodforest Blvd. to Wallisville Rd.?
Harris County Engineering Department is the property owner/developer of record for Sidewalk - Normandy Street from Woodforest Blvd. to Wallisville Rd., per its TDLR project registration.
Who is the architect or design firm for Sidewalk - Normandy Street from Woodforest Blvd. to Wallisville Rd.?
AKV Consulting Engineers is the design firm of record for Sidewalk - Normandy Street from Woodforest Blvd. to Wallisville Rd., according to its TDLR filing.
How much does Sidewalk - Normandy Street from Woodforest Blvd. to Wallisville Rd. cost and how big is it?
Sidewalk - Normandy Street from Woodforest Blvd. to Wallisville Rd. has an estimated construction value of $606K and approximately 77,000 square feet (about $8/sqft), based on its TDLR filing.
Scope of Work
The project consists of the construction of new sidewalks for Normandy Street from Woodforest Blvd. to Wallisville Rd. along with relocation of utilities, signs, reconstruction of driveways, sidewalk ramps, curb and gutter, pavement markings, and dev
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Normandy St from Woodforest Blvd to Wallisville Rd, Houston, TX, 77015
Related Projects
Same Owner
$308.1M totalWatch all construction in 77015 (Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Houston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.