LOW COST PET VET
LOW COST PET VET is a renovation/alteration project at 2905 WEST AVE, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $240K across about 3,015 sq ft.
๐Project Metrics
TDLR #TABS2022001154Project Registered
Project has been registered with TDLR and is in pre-construction phase
LOW COST PET VET is a Renovation/Alteration project located at 2905 WEST AVE, San Antonio, TX 78201 in San Antonio, Texas. The project has an estimated value of $240K covering 3,015 sq ft. THE STEVENS GROUP is the property owner and ZSTUDIO DESIGN is the design firm of record. The project was registered with TDLR on September 16, 2021.
โFrequently Asked Questions
What is LOW COST PET VET?
LOW COST PET VET is a renovation/alteration project at 2905 WEST AVE in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: INTERIOR TENANT FINISH-OUT FOR A PET VET CLINIC
Is LOW COST PET VET open in San Antonio?
LOW COST PET VET is currently under construction in San Antonio, TX. Its current TDLR status is "Project Registered".
Where is LOW COST PET VET located?
LOW COST PET VET is located at 2905 WEST AVE, San Antonio, TX, 78201, in Bexar County.
Who is the owner or developer of LOW COST PET VET?
THE STEVENS GROUP is the property owner/developer of record for LOW COST PET VET, per its TDLR project registration.
Who is the architect or design firm for LOW COST PET VET?
ZSTUDIO DESIGN is the design firm of record for LOW COST PET VET, according to its TDLR filing.
How much does LOW COST PET VET cost and how big is it?
LOW COST PET VET has an estimated construction value of $240K and approximately 3,015 square feet (about $80/sqft), based on its TDLR filing.
๐Scope of Work
INTERIOR TENANT FINISH-OUT FOR A PET VET CLINIC
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 16, 2021
Review Complete
Inspection Complete
Closed