Project intelligenceTDLR TABS2022003178Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Stockmens Bank Phase II

101 N Front Street, Cotulla, TX, 78014

Target date passed (May 2022)Review Complete

Stockmens Bank Phase II is a renovation/alteration project at 101 N Front Street, Cotulla, in La Salle County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish May 2022 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $399K across about 3,670 sq ft.

Estimated project value
$399K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
3,670 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$109/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 15, 2021228 days across supplied datesMay 31, 2022

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    3 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    225 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78014 (Cotulla)

One email per change. Unsubscribe in one click. Privacy.

Stockmens Bank Phase II is a Renovation/Alteration project located at 101 N Front Street, Cotulla, TX 78014 in Cotulla, Texas. The project has an estimated value of $399K covering 3,670 sq ft. City of Cotulla is the property owner and Frank Architects Inc. is the design firm of record. The project was registered with TDLR on October 15, 2021.

Frequently Asked Questions

What is Stockmens Bank Phase II?

Stockmens Bank Phase II is a renovation/alteration project at 101 N Front Street in Cotulla, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The scope of work includes plumbing, mechanical, and electrical construction work, and first and second story finishes for walls, ceilings and windows. The existing structure is located within the City's historic district.

Is Stockmens Bank Phase II open in Cotulla?

Stockmens Bank Phase II was scheduled to finish construction in May 2022 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Stockmens Bank Phase II located?

Stockmens Bank Phase II is located at 101 N Front Street, Cotulla, TX, 78014, in La Salle County.

Who is the owner or developer of Stockmens Bank Phase II?

City of Cotulla is the property owner/developer of record for Stockmens Bank Phase II, per its TDLR project registration.

Who is the architect or design firm for Stockmens Bank Phase II?

Frank Architects Inc. is the design firm of record for Stockmens Bank Phase II, according to its TDLR filing.

How much does Stockmens Bank Phase II cost and how big is it?

Stockmens Bank Phase II has an estimated construction value of $399K and approximately 3,670 square feet (about $109/sqft), based on its TDLR filing.

Scope of Work

The scope of work includes plumbing, mechanical, and electrical construction work, and first and second story finishes for walls, ceilings and windows. The existing structure is located within the City's historic district.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

101 N Front Street, Cotulla, TX, 78014

28.43594, -99.23394

Watch all construction in 78014 (Cotulla)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.