2800 Taylor
2800 Taylor is a new construction project at 2800 Taylor Street, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2024). The project has an estimated value of $60.0M across about 226,356 sq ft.
๐Project Metrics
TDLR #TABS2022003575Project Closed
Project has been completed and closed
2800 Taylor is a New Construction project located at 2800 Taylor Street, Dallas, TX 75226 in Dallas, Texas. The project has an estimated value of $60.0M covering 226,356 sq ft. Stillwater Capital is the property owner and OMNIPLAN is the design firm of record. The project was registered with TDLR on October 20, 2021.
โFrequently Asked Questions
What is 2800 Taylor?
2800 Taylor is a new construction project at 2800 Taylor Street in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: CONSTRUCTION OF A FIVE-STORY WOOD BUILDING OVER A THREE STORY CONCRETE PODIUM PLUS ONE LEVEL BELOW GRADE CONSISTING OF RESIDENTIAL OCCUPANCIES.
Is 2800 Taylor open in Dallas?
Construction on 2800 Taylor is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2024. The building is finished and very likely open.
Where is 2800 Taylor located?
2800 Taylor is located at 2800 Taylor Street, Dallas, TX, 75226, in Dallas County.
Who is the owner or developer of 2800 Taylor?
Stillwater Capital is the property owner/developer of record for 2800 Taylor, per its TDLR project registration.
Who is the architect or design firm for 2800 Taylor?
OMNIPLAN is the design firm of record for 2800 Taylor, according to its TDLR filing.
How much does 2800 Taylor cost and how big is it?
2800 Taylor has an estimated construction value of $60.0M and approximately 226,356 square feet (about $265/sqft), based on its TDLR filing.
๐Scope of Work
CONSTRUCTION OF A FIVE-STORY WOOD BUILDING OVER A THREE STORY CONCRETE PODIUM PLUS ONE LEVEL BELOW GRADE CONSISTING OF RESIDENTIAL OCCUPANCIES.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 20, 2021
Review Complete
Inspection Complete
Closed
Mar 29, 2024
๐Related Projects
๐คSame Owner
$79.7M totalProperty Owner
Design Firm
Registered Accessibility Specialist
Dallas County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Dallas County
Find General Contractors in Dallas