Project intelligenceTDLR TABS2022004067Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Natatorium HVAC Replacement at Friendswood High School

1115 Falling Leaf Drive, Friendswood, TX, 77546

Construction complete · Jul 2022Project Closed

Natatorium HVAC Replacement at Friendswood High School is a renovation/alteration project at 1115 Falling Leaf Drive, Friendswood, in Galveston County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2022). The project has an estimated value of $1.5M across about 3,068 sq ft.

Estimated project value
$1.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
3,068 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$489/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 28, 2021265 days across supplied datesJul 20, 2022

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    204 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    61 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77546 (Friendswood)

One email per change. Unsubscribe in one click. Privacy.

Natatorium HVAC Replacement at Friendswood High School is a Renovation/Alteration project located at 1115 Falling Leaf Drive, Friendswood, TX 77546 in Friendswood, Texas. The project has an estimated value of $1.5M covering 3,068 sq ft. Friendswood ISD is the property owner and PBK Architects, Inc. is the design firm of record. The project was registered with TDLR on October 28, 2021.

Frequently Asked Questions

What is Natatorium HVAC Replacement at Friendswood High School?

Natatorium HVAC Replacement at Friendswood High School is a renovation/alteration project at 1115 Falling Leaf Drive in Friendswood, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The existing HVAC unit serving the pool area at Friendswood High School’s freestanding natatorium building is to be replaced. The new equipment will consist of a chilled and heating water central plant and custom 50,000 CFM air handling…

Is Natatorium HVAC Replacement at Friendswood High School open in Friendswood?

Construction on Natatorium HVAC Replacement at Friendswood High School is complete — TDLR records show the project passed its required accessibility inspection in Jul 2022. The building is finished and very likely open.

Where is Natatorium HVAC Replacement at Friendswood High School located?

Natatorium HVAC Replacement at Friendswood High School is located at 1115 Falling Leaf Drive, Friendswood, TX, 77546, in Galveston County.

Who is the owner or developer of Natatorium HVAC Replacement at Friendswood High School?

Friendswood ISD is the property owner/developer of record for Natatorium HVAC Replacement at Friendswood High School, per its TDLR project registration.

Who is the architect or design firm for Natatorium HVAC Replacement at Friendswood High School?

PBK Architects, Inc. is the design firm of record for Natatorium HVAC Replacement at Friendswood High School, according to its TDLR filing.

How much does Natatorium HVAC Replacement at Friendswood High School cost and how big is it?

Natatorium HVAC Replacement at Friendswood High School has an estimated construction value of $1.5M and approximately 3,068 square feet (about $489/sqft), based on its TDLR filing.

Scope of Work

The existing HVAC unit serving the pool area at Friendswood High School’s freestanding natatorium building is to be replaced. The new equipment will consist of a chilled and heating water central plant and custom 50,000 CFM air handling unit.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1115 Falling Leaf Drive, Friendswood, TX, 77546

Location by street address

Watch all construction in 77546 (Friendswood)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Friendswood?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.