Project intelligenceTDLR TABS2022004906New Construction
Funding type

This project is privately funded, on private land for private use.

Lake Olympia at Vicksburg

1021 Lake Olympia Parkway, Missouri City, TX, 77459

Construction complete · Apr 2024Inspection Complete

Lake Olympia at Vicksburg is a new construction project at 1021 Lake Olympia Parkway, Missouri City, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2024). The project has an estimated value of $1.5M across about 17,400 sq ft.

Estimated project value
$1.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
17,400 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$85/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 3mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 9, 2021897 days across supplied datesApr 24, 2024

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    84 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    813 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77459 (Missouri City)

One email per change. Unsubscribe in one click. Privacy.

Lake Olympia at Vicksburg is a New Construction project located at 1021 Lake Olympia Parkway, Missouri City, TX 77459 in Missouri City, Texas. The project has an estimated value of $1.5M covering 17,400 sq ft. Hunington Properties is the property owner and Identity Architects is the design firm of record. The project was registered with TDLR on November 9, 2021.

Frequently Asked Questions

What is Lake Olympia at Vicksburg?

Lake Olympia at Vicksburg is a new construction project at 1021 Lake Olympia Parkway in Missouri City, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 1-story shell building and related site work.

Is Lake Olympia at Vicksburg open in Missouri City?

Construction on Lake Olympia at Vicksburg is complete — TDLR records show the project passed its required accessibility inspection in Apr 2024. The building is finished and very likely open.

Where is Lake Olympia at Vicksburg located?

Lake Olympia at Vicksburg is located at 1021 Lake Olympia Parkway, Missouri City, TX, 77459, in Fort Bend County.

Who is the owner or developer of Lake Olympia at Vicksburg?

Hunington Properties is the property owner/developer of record for Lake Olympia at Vicksburg, per its TDLR project registration.

Who is the architect or design firm for Lake Olympia at Vicksburg?

Identity Architects is the design firm of record for Lake Olympia at Vicksburg, according to its TDLR filing.

How much does Lake Olympia at Vicksburg cost and how big is it?

Lake Olympia at Vicksburg has an estimated construction value of $1.5M and approximately 17,400 square feet (about $85/sqft), based on its TDLR filing.

Scope of Work

1-story shell building and related site work.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1021 Lake Olympia Parkway, Missouri City, TX, 77459

Location by street address

Watch all construction in 77459 (Missouri City)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Missouri City?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.