South Lake Water Treatment Plant
๐Project Metrics
TDLR #TABS2022005046Review Complete
Design review complete, construction may proceed
๐Scope of Work
New construction of a 44 MGD firm capacity water treatment plant including an Administration Building with total square footage of 6,944 (adminstration buiding only).
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$25.3M total๐๏ธSame Design Firm
$44.1M total๐Related City Permits
Building permits found at or near this location
Utility disconnect/reconnect. Tesla Gateway. Overhead service. AE. Meter Can does not need replacing- NO ESPA attached
temporary tpole for new construction in Wildhorse 2025-084146 BP
New Construction - 2 Story Single-Family Residence attached garaged covered porch and patio 5/2.5 Revision: Plan revision to change the house plan from an X40LM to a T40DM
temporary tpole for new construction in Wildhorse Ref: 2025-103595-BP
New construction single-family residential 2-story 4 bedroom 3 bath with attached 2-car garage covered front porch and covered rear patio.