Project intelligenceTDLR TABS2022005222Additions to Existing Building
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Anna Middle School Addition and Renovation

1201 N Powell Pkwy, Anna, TX, 75409

Construction complete · Aug 2023Project Closed

Anna Middle School Addition and Renovation is a additions to existing building project at 1201 N Powell Pkwy, Anna, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2023). The project has an estimated value of $2.6M across about 13,195 sq ft.

Estimated project value
$2.6M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
13,195 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$197/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 7mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 12, 2021627 days across supplied datesAug 1, 2023

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    50 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    577 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75409 (Anna)

One email per change. Unsubscribe in one click. Privacy.

Anna Middle School Addition and Renovation is a Additions to Existing Building project located at 1201 N Powell Pkwy, Anna, TX 75409 in Anna, Texas. The project has an estimated value of $2.6M covering 13,195 sq ft. Anna independent School District is the property owner and WRA Architects is the design firm of record. The project was registered with TDLR on November 12, 2021.

Frequently Asked Questions

What is Anna Middle School Addition and Renovation?

Anna Middle School Addition and Renovation is a additions to existing building project at 1201 N Powell Pkwy in Anna, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New gymnasium addition that also serves as the storm shelter along with a locker room addition. Site work includes relocating an existing drive and parking

Is Anna Middle School Addition and Renovation open in Anna?

Construction on Anna Middle School Addition and Renovation is complete — TDLR records show the project passed its required accessibility inspection in Aug 2023. The building is finished and very likely open.

Where is Anna Middle School Addition and Renovation located?

Anna Middle School Addition and Renovation is located at 1201 N Powell Pkwy, Anna, TX, 75409, in Collin County.

Who is the owner or developer of Anna Middle School Addition and Renovation?

Anna independent School District is the property owner/developer of record for Anna Middle School Addition and Renovation, per its TDLR project registration.

Who is the architect or design firm for Anna Middle School Addition and Renovation?

WRA Architects is the design firm of record for Anna Middle School Addition and Renovation, according to its TDLR filing.

How much does Anna Middle School Addition and Renovation cost and how big is it?

Anna Middle School Addition and Renovation has an estimated construction value of $2.6M and approximately 13,195 square feet (about $197/sqft), based on its TDLR filing.

Scope of Work

New gymnasium addition that also serves as the storm shelter along with a locker room addition. Site work includes relocating an existing drive and parking

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1201 N Powell Pkwy, Anna, TX, 75409

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75409 (Anna)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.