Project intelligenceTDLR TABS2022006461New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Paving and Drainage Improvements Street Recon Group 17-3003 in Dallas, TX

Grassy Ridge Trail between Scottsboro & Penguin Dr, Dallas, TX, 75241

Construction complete · Dec 2024Project Closed

Paving and Drainage Improvements Street Recon Group 17-3003 is a new construction project at Grassy Ridge Trail between Scottsboro & Penguin Dr, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2024). The project has an estimated value of $705K across about 48,050 sq ft.

Estimated project value
$705K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
48,050 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$15/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 11mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 2, 20211,125 days across supplied datesDec 31, 2024

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    80 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    1,045 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75241 (Dallas)

One email per change. Unsubscribe in one click. Privacy.

Paving and Drainage Improvements Street Recon Group 17-3003 is a New Construction project located at Grassy Ridge Trail between Scottsboro & Penguin Dr, Dallas, TX 75241 in Dallas, Texas. The project has an estimated value of $705K covering 48,050 sq ft. City of Dallas, Public Works is the property owner and Gresham Smith is the design firm of record. The project was registered with TDLR on December 2, 2021.

Frequently Asked Questions

What is Paving and Drainage Improvements Street Recon Group 17-3003?

Paving and Drainage Improvements Street Recon Group 17-3003 is a new construction project at Grassy Ridge Trail between Scottsboro & Penguin Dr in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Street Reconstruction of Grassy Ridge Trail between Scottsboro Lane and Penguin Dr. This includes new concrete street pavement, sidewalk, curb and gutter.

Is Paving and Drainage Improvements Street Recon Group 17-3003 open in Dallas?

Construction on Paving and Drainage Improvements Street Recon Group 17-3003 is complete — TDLR records show the project passed its required accessibility inspection in Dec 2024. The building is finished and very likely open.

Where is Paving and Drainage Improvements Street Recon Group 17-3003 located?

Paving and Drainage Improvements Street Recon Group 17-3003 is located at Grassy Ridge Trail between Scottsboro & Penguin Dr, Dallas, TX, 75241, in Dallas County.

Who is the owner or developer of Paving and Drainage Improvements Street Recon Group 17-3003?

City of Dallas, Public Works is the property owner/developer of record for Paving and Drainage Improvements Street Recon Group 17-3003, per its TDLR project registration.

Who is the architect or design firm for Paving and Drainage Improvements Street Recon Group 17-3003?

Gresham Smith is the design firm of record for Paving and Drainage Improvements Street Recon Group 17-3003, according to its TDLR filing.

How much does Paving and Drainage Improvements Street Recon Group 17-3003 cost and how big is it?

Paving and Drainage Improvements Street Recon Group 17-3003 has an estimated construction value of $705K and approximately 48,050 square feet (about $15/sqft), based on its TDLR filing.

Scope of Work

Street Reconstruction of Grassy Ridge Trail between Scottsboro Lane and Penguin Dr. This includes new concrete street pavement, sidewalk, curb and gutter.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Grassy Ridge Trail between Scottsboro & Penguin Dr, Dallas, TX, 75241

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75241 (Dallas)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.