Project intelligenceTDLR TABS2022006805Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

VGXI - Manufacturing Phase 2 in Conroe, TX

10130 Deison Park Boulevard, Conroe, TX, 77303

Construction complete · Feb 2023Project Closed

VGXI - Manufacturing Phase 2 is a renovation/alteration project at 10130 Deison Park Boulevard, Conroe, in Montgomery County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2023). The project has an estimated value of $31.0M across about 19,907 sq ft.

Estimated project value
$31.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
19,907 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$1.56K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 1mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 7, 2021448 days across supplied datesFeb 28, 2023

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    56 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    392 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77303 (Conroe)

One email per change. Unsubscribe in one click. Privacy.

VGXI - Manufacturing Phase 2 is a Renovation/Alteration project located at 10130 Deison Park Boulevard, Conroe, TX 77303 in Conroe, Texas. The project has an estimated value of $31.0M covering 19,907 sq ft. VGXI Inc is the property owner and Hanbury is the design firm of record. The project was registered with TDLR on December 7, 2021.

Frequently Asked Questions

What is VGXI - Manufacturing Phase 2?

VGXI - Manufacturing Phase 2 is a renovation/alteration project at 10130 Deison Park Boulevard in Conroe, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Fit out of phase 2 pharmaceutical manufacturing area.

Is VGXI - Manufacturing Phase 2 open in Conroe?

Construction on VGXI - Manufacturing Phase 2 is complete — TDLR records show the project passed its required accessibility inspection in Feb 2023. The building is finished and very likely open.

Where is VGXI - Manufacturing Phase 2 located?

VGXI - Manufacturing Phase 2 is located at 10130 Deison Park Boulevard, Conroe, TX, 77303, in Montgomery County.

Who is the owner or developer of VGXI - Manufacturing Phase 2?

VGXI Inc is the property owner/developer of record for VGXI - Manufacturing Phase 2, per its TDLR project registration.

Who is the architect or design firm for VGXI - Manufacturing Phase 2?

Hanbury is the design firm of record for VGXI - Manufacturing Phase 2, according to its TDLR filing.

How much does VGXI - Manufacturing Phase 2 cost and how big is it?

VGXI - Manufacturing Phase 2 has an estimated construction value of $31.0M and approximately 19,907 square feet (about $1.56K/sqft), based on its TDLR filing.

Scope of Work

Fit out of phase 2 pharmaceutical manufacturing area.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

10130 Deison Park Boulevard, Conroe, TX, 77303

Loading location map…
30.36388, -95.43101

Watch all construction in 77303 (Conroe)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.