201 5th St. Mix Use
201 5th St. Mix Use is a new construction project at 201 E 5th Street, Ferris, in Ellis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $1.1M across about 6,626 sq ft.
๐Project Metrics
TDLR #TABS2022006845Review Complete
Design review complete, construction may proceed
201 5th St. Mix Use is a New Construction project located at 201 E 5th Street, Ferris, TX 75125 in Ferris, Texas. The project has an estimated value of $1.1M covering 6,626 sq ft. MJ Crocker Company, LLC is the property owner and The Studio E Design Group is the design firm of record. The project was registered with TDLR on December 7, 2021.
โFrequently Asked Questions
What is 201 5th St. Mix Use?
201 5th St. Mix Use is a new construction project at 201 E 5th Street in Ferris, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New construction of a mixed use building including commercial lease space and 6 dwelling units.
Is 201 5th St. Mix Use open in Ferris?
201 5th St. Mix Use is currently under construction in Ferris, TX. Its current TDLR status is "Review Complete".
Where is 201 5th St. Mix Use located?
201 5th St. Mix Use is located at 201 E 5th Street, Ferris, TX, 75125, in Ellis County.
Who is the owner or developer of 201 5th St. Mix Use?
MJ Crocker Company, LLC is the property owner/developer of record for 201 5th St. Mix Use, per its TDLR project registration.
Who is the architect or design firm for 201 5th St. Mix Use?
The Studio E Design Group is the design firm of record for 201 5th St. Mix Use, according to its TDLR filing.
How much does 201 5th St. Mix Use cost and how big is it?
201 5th St. Mix Use has an estimated construction value of $1.1M and approximately 6,626 square feet (about $158/sqft), based on its TDLR filing.
๐Scope of Work
New construction of a mixed use building including commercial lease space and 6 dwelling units.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 7, 2021
Review Complete
Dec 7, 2021
Inspection Complete
Closed
๐Related Projects
๐๏ธSame Design Firm
$18.4M totalProperty Owner
Design Firm
Registered Accessibility Specialist
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Ellis County
Find General Contractors in Ellis