Project intelligenceTDLR TABS2022007386Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

GERMANIA BUILDING PHASE III 2ND FLOOR RENOVATION in Brenham, TX

507 HWY 290 EAST, Brenham, TX, 77833

Construction complete · Aug 2022Project Closed

GERMANIA BUILDING PHASE III 2ND FLOOR RENOVATION is a renovation/alteration project at 507 HWY 290 EAST, Brenham, in Washington County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2022). The project has an estimated value of $2.1M across about 14,581 sq ft.

Estimated project value
$2.1M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
14,581 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$144/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
7 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 15, 2021231 days across supplied datesAug 3, 2022

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    19 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    212 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77833 (Brenham)

One email per change. Unsubscribe in one click. Privacy.

GERMANIA BUILDING PHASE III 2ND FLOOR RENOVATION is a Renovation/Alteration project located at 507 HWY 290 EAST, Brenham, TX 77833 in Brenham, Texas. The project has an estimated value of $2.1M covering 14,581 sq ft. Germania Insurance is the property owner and PlanNorth Architectural Co. is the design firm of record. The project was registered with TDLR on December 15, 2021.

Frequently Asked Questions

What is GERMANIA BUILDING PHASE III 2ND FLOOR RENOVATION?

GERMANIA BUILDING PHASE III 2ND FLOOR RENOVATION is a renovation/alteration project at 507 HWY 290 EAST in Brenham, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: EXISTING OFFICE SPACE WILL INCLUDE INTERIOR RENOVATIONS WITH NEW PARTITIONS, FLOORING, DOORS, WINDOWS, LIGHTING AND CEILINGS IN THE OPEN OFFICES, BREAKROOM, AND SUPPORT SPACES

Is GERMANIA BUILDING PHASE III 2ND FLOOR RENOVATION open in Brenham?

Construction on GERMANIA BUILDING PHASE III 2ND FLOOR RENOVATION is complete — TDLR records show the project passed its required accessibility inspection in Aug 2022. The building is finished and very likely open.

Where is GERMANIA BUILDING PHASE III 2ND FLOOR RENOVATION located?

GERMANIA BUILDING PHASE III 2ND FLOOR RENOVATION is located at 507 HWY 290 EAST, Brenham, TX, 77833, in Washington County.

Who is the owner or developer of GERMANIA BUILDING PHASE III 2ND FLOOR RENOVATION?

Germania Insurance is the property owner/developer of record for GERMANIA BUILDING PHASE III 2ND FLOOR RENOVATION, per its TDLR project registration.

Who is the architect or design firm for GERMANIA BUILDING PHASE III 2ND FLOOR RENOVATION?

PlanNorth Architectural Co. is the design firm of record for GERMANIA BUILDING PHASE III 2ND FLOOR RENOVATION, according to its TDLR filing.

How much does GERMANIA BUILDING PHASE III 2ND FLOOR RENOVATION cost and how big is it?

GERMANIA BUILDING PHASE III 2ND FLOOR RENOVATION has an estimated construction value of $2.1M and approximately 14,581 square feet (about $144/sqft), based on its TDLR filing.

Scope of Work

EXISTING OFFICE SPACE WILL INCLUDE INTERIOR RENOVATIONS WITH NEW PARTITIONS, FLOORING, DOORS, WINDOWS, LIGHTING AND CEILINGS IN THE OPEN OFFICES, BREAKROOM, AND SUPPORT SPACES

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

507 HWY 290 EAST, Brenham, TX, 77833

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77833 (Brenham)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.