Lightedge Data Wall 2 Finish Out
Lightedge Data Wall 2 Finish Out is a renovation/alteration project at 7000 Burleson Road Bldg B, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $4.7M across about 10,570 sq ft.
๐Project Metrics
TDLR #TABS2022007839Review Complete
Design review complete, construction may proceed
Lightedge Data Wall 2 Finish Out is a Renovation/Alteration project located at 7000 Burleson Road Bldg B, Austin, TX 78744 in Austin, Texas. The project has an estimated value of $4.7M covering 10,570 sq ft. East Group Properties is the property owner and Page Southerland Page (Page) is the design firm of record. The project was registered with TDLR on December 20, 2021.
โFrequently Asked Questions
What is Lightedge Data Wall 2 Finish Out?
Lightedge Data Wall 2 Finish Out is a renovation/alteration project at 7000 Burleson Road Bldg B in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Convert empty shell space into 10,000 SF Data Hall with associated mechanical and electrical upgrades to support the finish-out,
Is Lightedge Data Wall 2 Finish Out open in Austin?
Lightedge Data Wall 2 Finish Out is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
Where is Lightedge Data Wall 2 Finish Out located?
Lightedge Data Wall 2 Finish Out is located at 7000 Burleson Road Bldg B, Austin, TX, 78744, in Travis County.
Who is the owner or developer of Lightedge Data Wall 2 Finish Out?
East Group Properties is the property owner/developer of record for Lightedge Data Wall 2 Finish Out, per its TDLR project registration.
Who is the architect or design firm for Lightedge Data Wall 2 Finish Out?
Page Southerland Page (Page) is the design firm of record for Lightedge Data Wall 2 Finish Out, according to its TDLR filing.
How much does Lightedge Data Wall 2 Finish Out cost and how big is it?
Lightedge Data Wall 2 Finish Out has an estimated construction value of $4.7M and approximately 10,570 square feet (about $443/sqft), based on its TDLR filing.
๐Scope of Work
Convert empty shell space into 10,000 SF Data Hall with associated mechanical and electrical upgrades to support the finish-out,
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 20, 2021
Review Complete
Dec 20, 2021
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$705.4M total๐๏ธSame Design Firm
$15.61B total๐Related City Permits
Building permits found at or near this location
Replacement of an existing water heater 50 Gallon Natural Gas Water Heater Replacement
Replacement of complete existing central heat and air system with or without duct work
Secondary Plumbing Contractor- Install 3000 of sewer pipe and 2400 of water line on the outside.
Replacement of complete existing central heat and air system with or without duct work
Change/Upgrade electrical service to 200 Amp meter base and panel