SUITE 150 DEMISING WALL
SUITE 150 DEMISING WALL is a renovation/alteration project at 7000 BURLESON BUILDING A, SUITE 150, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2022). The project has an estimated value of $300K across about 1,909 sq ft.
๐Project Metrics
TDLR #TABS2022008061Project Closed
Project has been completed and closed
SUITE 150 DEMISING WALL is a Renovation/Alteration project located at 7000 BURLESON BUILDING A, SUITE 150, Austin, TX 78744 in Austin, Texas. The project has an estimated value of $300K covering 1,909 sq ft. STREAM is the property owner and Sixthriver Architects is the design firm of record. The project was registered with TDLR on December 22, 2021.
โFrequently Asked Questions
What is SUITE 150 DEMISING WALL?
SUITE 150 DEMISING WALL is a renovation/alteration project at 7000 BURLESON BUILDING A, SUITE 150 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: INTERIOR ALTERATION CONSISTING OF A NEW DEMISING WALL
Is SUITE 150 DEMISING WALL open in Austin?
Construction on SUITE 150 DEMISING WALL is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2022. The building is finished and very likely open.
Where is SUITE 150 DEMISING WALL located?
SUITE 150 DEMISING WALL is located at 7000 BURLESON BUILDING A, SUITE 150, Austin, TX, 78744, in Travis County.
Who is the owner or developer of SUITE 150 DEMISING WALL?
STREAM is the property owner/developer of record for SUITE 150 DEMISING WALL, per its TDLR project registration.
Who is the architect or design firm for SUITE 150 DEMISING WALL?
Sixthriver Architects is the design firm of record for SUITE 150 DEMISING WALL, according to its TDLR filing.
How much does SUITE 150 DEMISING WALL cost and how big is it?
SUITE 150 DEMISING WALL has an estimated construction value of $300K and approximately 1,909 square feet (about $157/sqft), based on its TDLR filing.
๐Scope of Work
INTERIOR ALTERATION CONSISTING OF A NEW DEMISING WALL
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 22, 2021
Review Complete
Inspection Complete
Closed
Aug 31, 2022
๐Related Projects
๐คSame Owner
$40.4M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
Secondary Plumbing Contractor- Install 3000 of sewer pipe and 2400 of water line on the outside.
Replacement of complete existing central heat and air system with or without duct work
Change/Upgrade electrical service to 200 Amp meter base and panel
New 2 story SFR attached garage covered porch and patio 4/3