Block 164 North Gateway Project is a new construction project at 1313 Red River, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2022). The project has an estimated value of $866K across about 10,165 sq ft.
Project has been completed and closed
Block 164 North Gateway Project is a New Construction project located at 1313 Red River, Austin, TX 78701 in Austin, Texas. The project has an estimated value of $866K covering 10,165 sq ft. The 2033 Higher Education Development Foundation is the property owner and Gensler is the design firm of record. The project was registered with TDLR on January 3, 2022.
Block 164 North Gateway Project is a new construction project at 1313 Red River in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Landscape, landscape lighting, and exterior walks, stairs, and ramps located on the Block 168 property.
Construction on Block 164 North Gateway Project is complete โ TDLR records show the project passed its required accessibility inspection in May 2022. The building is finished and very likely open.
Block 164 North Gateway Project is located at 1313 Red River, Austin, TX, 78701, in Travis County.
The 2033 Higher Education Development Foundation is the property owner/developer of record for Block 164 North Gateway Project, per its TDLR project registration.
Gensler is the design firm of record for Block 164 North Gateway Project, according to its TDLR filing.
Block 164 North Gateway Project has an estimated construction value of $866K and approximately 10,165 square feet (about $85/sqft), based on its TDLR filing.
Landscape, landscape lighting, and exterior walks, stairs, and ramps located on the Block 168 property.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jan 3, 2022
Review Complete
Inspection Complete
Closed
May 1, 2022
Building permits found at or near this location
Emergency Inspection was performed work complete. Replaced sub panel in garage due to arcing main breaker. Install main disconnect outside next to meter.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Irrigation front and back yard - 6 zones
Replacement of an existing water heater