Project intelligenceTDLR TABS2022008964New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

SH 18 in Kermit, TX

SH 115 to New Mexico State Line, Kermit, TX, 79745

Construction complete · Sep 2024Project Closed

SH 18 is a new construction project at SH 115 to New Mexico State Line, Kermit, in Winkler County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2024). The project has an estimated value of $310K across about 17,500 sq ft.

Estimated project value
$310K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
17,500 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$18/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 3mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 11, 2022984 days across supplied datesSep 21, 2024

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    171 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    813 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79745 (Kermit)

One email per change. Unsubscribe in one click. Privacy.

SH 18 is a New Construction project located at SH 115 to New Mexico State Line, Kermit, TX 79745 in Kermit, Texas. The project has an estimated value of $310K covering 17,500 sq ft. TxDOT District: Odessa is the property owner and I. S. Engineers, LLC is the design firm of record. The project was registered with TDLR on January 11, 2022.

Frequently Asked Questions

What is SH 18?

SH 18 is a new construction project at SH 115 to New Mexico State Line in Kermit, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: REHABILITATION OF EXISTING ROAD CONSISTING OF REHABILITAION OF EXISTING ROAD CONSISTING OF PAVEMENT REHAB, CURB & GUTTER, SIDEWALKS, ADA RAMPS, TRAFFIC SIGNALS, SIGNING AND PAVEMENT MARKINGS.

Is SH 18 open in Kermit?

Construction on SH 18 is complete — TDLR records show the project passed its required accessibility inspection in Sep 2024. The building is finished and very likely open.

Where is SH 18 located?

SH 18 is located at SH 115 to New Mexico State Line, Kermit, TX, 79745, in Winkler County.

Who is the owner or developer of SH 18?

TxDOT District: Odessa is the property owner/developer of record for SH 18, per its TDLR project registration.

Who is the architect or design firm for SH 18?

I. S. Engineers, LLC is the design firm of record for SH 18, according to its TDLR filing.

How much does SH 18 cost and how big is it?

SH 18 has an estimated construction value of $310K and approximately 17,500 square feet (about $18/sqft), based on its TDLR filing.

Scope of Work

REHABILITATION OF EXISTING ROAD CONSISTING OF REHABILITAION OF EXISTING ROAD CONSISTING OF PAVEMENT REHAB, CURB & GUTTER, SIDEWALKS, ADA RAMPS, TRAFFIC SIGNALS, SIGNING AND PAVEMENT MARKINGS.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

SH 115 to New Mexico State Line, Kermit, TX, 79745

31.85701, -103.09614

Watch all construction in 79745 (Kermit)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.