District Wide HVAC Replacements 2022 in Copperas Cove, TX
408 S Main St., Copperas Cove, TX, 76522
District Wide HVAC Replacements 2022 is a renovation/alteration project at 408 S Main St., Copperas Cove, in Coryell County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Oct 2022 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $2.5M across about 244 sq ft.
- Estimated project value
- $2.5M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 244 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $10.25K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 5 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
134 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
152 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76522 (Copperas Cove)
One email per change. Unsubscribe in one click. Privacy.
District Wide HVAC Replacements 2022 is a Renovation/Alteration project located at 408 S Main St., Copperas Cove, TX 76522 in Copperas Cove, Texas. The project has an estimated value of $2.5M covering 244 sq ft. Copperas Cove ISD is the property owner and O'Connell Robertson is the design firm of record. The project was registered with TDLR on January 18, 2022.
Frequently Asked Questions
What is District Wide HVAC Replacements 2022?
District Wide HVAC Replacements 2022 is a renovation/alteration project at 408 S Main St. in Copperas Cove, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The project consists of select HVAC replacements at Copperas Cove High School, Junior High School, Bulldawg Stadium, Miss Jewell, Martin Walker, Facilities/Maintenance, and CNS/Warehouse.
Is District Wide HVAC Replacements 2022 open in Copperas Cove?
District Wide HVAC Replacements 2022 was scheduled to finish construction in Oct 2022 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is District Wide HVAC Replacements 2022 located?
District Wide HVAC Replacements 2022 is located at 408 S Main St., Copperas Cove, TX, 76522, in Coryell County.
Who is the owner or developer of District Wide HVAC Replacements 2022?
Copperas Cove ISD is the property owner/developer of record for District Wide HVAC Replacements 2022, per its TDLR project registration.
Who is the architect or design firm for District Wide HVAC Replacements 2022?
O'Connell Robertson is the design firm of record for District Wide HVAC Replacements 2022, according to its TDLR filing.
How much does District Wide HVAC Replacements 2022 cost and how big is it?
District Wide HVAC Replacements 2022 has an estimated construction value of $2.5M and approximately 244 square feet (about $10.25K/sqft), based on its TDLR filing.
Scope of Work
The project consists of select HVAC replacements at Copperas Cove High School, Junior High School, Bulldawg Stadium, Miss Jewell, Martin Walker, Facilities/Maintenance, and CNS/Warehouse.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
408 S Main St., Copperas Cove, TX, 76522
Related Projects
Same Owner
$32.6M totalNearby Projects
Within 0.6 miWatch all construction in 76522 (Copperas Cove)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Copperas Cove?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.