Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
La Salle County JP Office Precinct 3
513 Martinez Street, Cotulla, TX, 78014
La Salle County JP Office Precinct 3 is a new construction project at 513 Martinez Street, Cotulla, in La Salle County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2024). The project has an estimated value of $1.1M across about 2,994 sq ft.
- Estimated project value
- $1.1M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 2,994 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $367/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 11mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
26 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
700 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
📰About La Salle County JP Office Precinct 3
JP 3 is the name of the new construction project located at 513 Martinez Street in Cotulla. The filing identifies this site as the La Salle County JP Office Precinct 3. The building is a 2,994 sq ft wood framed structure designed to house offices for the Justice of the Peace, Constable, and County Commissioner. The project was registered with TDLR in January 2022.
Killis Almond Architects served as the design firm of record for JP 3. The scope of work specified a slab on grade foundation supporting the wood frame structure. The estimated cost for the project was $1,100,000, which calculates to $367 per square foot. Construction began in February 2022 following the initial registration.
Project Status and County Context
TDLR closed the project file in January 2024, marking the end of the accessibility review process for this construction. The scheduled build window for JP 3 was 700 days. This duration is longer than the county median of 245 days for similar new construction filings in La Salle County. The estimated cost of $1,100,000 is below the county median of $1,325,000 for new construction projects.
Despite the lower total cost compared to the county median, the cost per square foot of $367 is above the county median of $237. This metric reflects the specific design and material choices made for the Justice of the Peace offices. The project is located in a ZIP code with a population of about 5,542 according to U.S. Census ACS 2023 estimates. Nearby businesses include Martinez Park & Pool and La Salle County Fire Station #1.
The County of La Salle is the owner of record for this facility. Killis Almond Architects has another TDLR-registered project in San Angelo for the Long Barracks and Mess Hall 3, which totaled $2,200,000. The current project remains closed in the TDLR records . No further construction activity is indicated in the filing after the completion date.
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78014 (Cotulla)
One email per change. Unsubscribe in one click. Privacy.
La Salle County JP Office Precinct 3 is a New Construction project located at 513 Martinez Street, Cotulla, TX 78014 in Cotulla, Texas. The project has an estimated value of $1.1M covering 2,994 sq ft. County of La Salle is the property owner and Killis Almond Architects is the design firm of record. The project was registered with TDLR on January 19, 2022.
Frequently Asked Questions
Is the JP 3 office open for business?
The TDLR record indicates the construction project is closed. It does not confirm whether the business is open or operating, as construction status and business opening are different things.
Who designed the building at 513 Martinez Street?
Killis Almond Architects is the design firm of record for the La Salle County JP Office Precinct 3 project in Cotulla.
What is the square footage of the new building?
The new construction project is 2,994 sq ft and includes offices for the Justice of the Peace, Constable, and County Commissioner.
When did the construction project end?
TDLR closed the project file in January 2024, which marks the end of the accessibility review process for this construction.
What is La Salle County JP Office Precinct 3?
La Salle County JP Office Precinct 3 is a new construction project at 513 Martinez Street in Cotulla, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construct a new 2,994 s.f. wood framed building with slab on grade foundation to house offices for the Justice of the Peace, Constable and County Commissioner.
Is La Salle County JP Office Precinct 3 open in Cotulla?
Construction on La Salle County JP Office Precinct 3 is complete — TDLR records show the project passed its required accessibility inspection in Jan 2024. The building is finished and very likely open.
Where is La Salle County JP Office Precinct 3 located?
La Salle County JP Office Precinct 3 is located at 513 Martinez Street, Cotulla, TX, 78014, in La Salle County.
Who is the owner or developer of La Salle County JP Office Precinct 3?
County of La Salle is the property owner/developer of record for La Salle County JP Office Precinct 3, per its TDLR project registration.
Who is the architect or design firm for La Salle County JP Office Precinct 3?
Killis Almond Architects is the design firm of record for La Salle County JP Office Precinct 3, according to its TDLR filing.
How much does La Salle County JP Office Precinct 3 cost and how big is it?
La Salle County JP Office Precinct 3 has an estimated construction value of $1.1M and approximately 2,994 square feet (about $367/sqft), based on its TDLR filing.
Scope of Work
Construct a new 2,994 s.f. wood framed building with slab on grade foundation to house offices for the Justice of the Peace, Constable and County Commissioner.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
513 Martinez Street, Cotulla, TX, 78014
Related Projects
Same Design Firm
$32.6M totalNearby Projects
Within 1 kmWatch all construction in 78014 (Cotulla)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Cotulla?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.